High-quality facade finishing in-house, with minimal tolerances

High-quality facade finishing in-house, with minimal tolerances

The combination of BIM engineering, production, delivery and assembly of the facade plus rear construction is a specialty, and also the specialty of Leebo Intelligent Building Systems. Especially with cascading renovations, as in the case of the Financial Plaza on the ING Campus in Amsterdam-Zuidoost, the combination of architecture and high-quality, thermal sealing requires process-oriented control, says Head of Calculation and Sales Jan Couwenberg.

The façade of the Financial Plaza, located some distance from the newly built ING HQ, is being replaced under high-quality architecture. "The design quality is always bespoke, even though we provide concept products," says Couwenberg. "As usual in our projects, the facades are finished with LeeBond, a sleek, stable and lightweight shell of aluminum composite with great freedom of form." The elements are CNC-milled in-house and combined with the steel rear frame structure LeeFrame, which, like LeeBond, was developed in-house. "LeeFrame is an inner leaf that allows for large spans and, like the facade cladding, is primarily assembled from custom frames for this project."

20200211_130843-kopieren

The facade will feature 400 LeeFrames 10.80 meters long and 3.60 meters high, as well as 900 bronze-coated LeeBond elements.

 

Qv value

The facade will feature 400 LeeFrames 10.80 meters long and 3.60 meters high, as well as 900 bronze-coated LeeBond elements. Engineering with the latest BIM updates and assembly with our own equipment ensures a total delivery tailored to the project. Couwenberg: "Production, transport, logistics and assembly are carried out entirely in-house and just-in-time deliveries were made: from the transport, assembly was carried out directly using cranes and telescopic handlers. The final tolerances and qv value of the façade are so low that a one-party process approach is essential, and that is our specialty. The elements were fixed blind and with blower door tests a qv value of 0.18 was achieved, very low for shell renovations. With our own equipment and 5 to 6 personnel, we completed the job in 10 months, to be delivered in the first quarter of 2020. With a process-oriented management from head to tail, we can offer the right quality guarantee and relieve the contractor."   

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Send us a message

Wij gebruiken cookies. Daarmee analyseren we het gebruik van de website en verbeteren we het gebruiksgemak.

Details

Kunnen we je helpen met zoeken?

Bekijk alle resultaten