
From acoustic wall panels to anti-glare louvers In October, the extended A16 Rotterdam opened; an 11-kilometer-long national highway between the A16/A20 at Terbregseplein and the A13 at Rotterdam The Hague Airport. To properly fit the new and energy-neutral route into the landscape, the Rottemerentunnel was constructed on the north side of Rotterdam. This tunnel [...]

Getting a grip on the soil The construction of The Green Arch places high demands on everything below ground level. CRUX became involved as a geotechnical consultant at the end of 2018 and made an essential contribution to the design and implementation of the tunnel's passage through the regional flood defenses, soil bodies, structures and temporary structures. CRUX [...]

Five years ago one of the most far-reaching rail projects in the Netherlands began in Groningen: the renovation and expansion of Groningen Main Station into a high-quality public transport hub and the realization of a new yard. Without a solid subway, water drainage, sewerage and infrastructure, none of the tracks would have been in place. Molhoek Infratechniek was the lynchpin in [...]
Increase your visibility and let customers find you. Free registration is easy to do!
Sign up for free