
The shortage of affordable student housing continues to grow. Addressing this problem requires an innovative way of developing, engineering and building. High Five in Utrecht shows what is possible in this regard. The project consists of two tall residential towers on the Utrecht Science Park with a total of 921 studios and rooms, which will be built in short [...].

Five years ago one of the most far-reaching rail projects in the Netherlands began in Groningen: the renovation and expansion of Groningen Main Station into a high-quality public transport hub and the realization of a new yard. Without a solid subway, water drainage, sewerage and infrastructure, none of the tracks would have been in place. Molhoek Infratechniek was the lynchpin in [...]

Getting a grip on the soil The construction of The Green Arch places high demands on everything below ground level. CRUX became involved as a geotechnical consultant at the end of 2018 and made an essential contribution to the design and implementation of the tunnel's passage through the regional flood defenses, soil bodies, structures and temporary structures. CRUX [...]
Increase your visibility and let customers find you. Free registration is easy to do!
Sign up for free