
Getting a grip on the soil The construction of The Green Arch places high demands on everything below ground level. CRUX became involved as a geotechnical consultant at the end of 2018 and made an essential contribution to the design and implementation of the tunnel's passage through the regional flood defenses, soil bodies, structures and temporary structures. CRUX [...]

Five years ago one of the most far-reaching rail projects in the Netherlands began in Groningen: the renovation and expansion of Groningen Main Station into a high-quality public transport hub and the realization of a new yard. Without a solid subway, water drainage, sewerage and infrastructure, none of the tracks would have been in place. Molhoek Infratechniek was the lynchpin in [...]

Van akoestische wandpanelen tot anti-verblindingslamellen In oktober opende de verlengde A16 Rotterdam; een 11 kilometer lange rijksweg tussen de A16/A20 bij het Terbregseplein en de A13 bij Rotterdam The Hague Airport. Om het nieuwe en energieneutrale tracé goed in te passen in het landschap, is aan de noordkant van Rotterdam de Rottemerentunnel aangelegd. Deze tunnel […]

Increase your visibility and let customers find you. Free registration is easy to do!
Sign up for free