Our own engineers chose as solution the Twintec Ultimate floor, executed on HSP piles in view of the soil conditions in this region. Based on this design, our own Twintec people realized the high flatness DIN15185, which was amply achieved.
In 23 days, 42,000 m2 of Twintec Ultimate was realized with the in-house produced Laserscreed and Toppingspreader in combination with our own craftsmen. In short, Twintec delivered a total product of which we can be proud.
Neem dan rechtstreeks contact op met Twintec.