Renovation & conversion

2Amsterdam | Amsterdam

2Amsterdam | Amsterdam

The reason was clear: AkzoNobel and Stibbe, the former anchor tenants of two identical office towers on the north side of Amsterdam Zuid station, moved to new-build premises in 2016. The impending construction of the Zuidasdok prompted owner Commerz Real to press ahead with redevelopment. With Provast as delegated developer, it was decided to undertake a major upgrade, creating a hotel tower and an office tower linked to form a single ensemble. This was a technically complex operation, for which J.P. van Eesteren put forward the best solutions.

Zuidas office towers converted into a multifunctional ensemble

De markt vraagt nu eenmaal om kwalitatieve werkplekken, ook om personeel te werven.

Sheet piles form the cofferdam for the parking levels beneath the eastern tower.

“In 2013, when we began drawing up the plans, the market was poor, but the location was still exceptionally good,” says Provast project director Jurjen Thomas. “At Provast’s suggestion, the owner chose to convert one tower into a hotel and enlarge the other to create a modern office building. The Spanish hotel chain Meliã will open its first Dutch property here. The 64-metre-high western tower will be extended upwards by three floors, including a sky bar, the first on the Zuidas. The office tower will be expanded from 14,000 to around 23,000 m² gross floor area. The extra space will be created by extending the building outwards: in response to demand for large floor plates, a new low-rise section will be built around the tower, with an atrium. Both existing buildings will be given new unitised façades and brought together as an ensemble by a frame around the inner courtyard. It looked straightforward from a construction perspective, but there were many underlying requirements and external factors.”

Complex cofferdam
First, the owner and architect wanted to create a single ensemble. The decision to build the Zuidasdok, which will widen the infrastructure corridor through the Zuidas, meant that the car park had to be demolished and new parking facilities provided. “That proved no easy task,” says Thomas. “A complex cofferdam had to be constructed for the three new parking levels beneath the towers. Grout anchors belonging to the neighbouring WTC were found within the work area, and the street level of the adjacent Strawinskylaan is higher than ground level. There are also a considerable number of professional stakeholders: the municipality, central government, and the owners of the WTC and Atrium office building. We needed to select a contractor with expertise in technical complexity and high-quality collaboration. The project is also under time pressure because of the Zuidasdok.”

Robust solutions
Provast’s proactive role on behalf of the owner during the preparatory phase led, after the detailed design had been developed, to an Engineer & Build contract with J.P. van Eesteren. “They offered the most robust solutions to the technical challenges and suggested ways to optimise the project,” says Thomas. “J.P. van Eesteren also has a strong track record in stakeholder management.” 

Het warehouse is opgesplitst in twee delen, waarvoor Cordeel een 60 minuten brandscheiding realiseert.

The extension of the western tower will include a sky bar.

“The complexity lies mainly in the cofferdam and the external factors,” says J.P. van Eesteren project manager Paul van Kats. “As there is no natural impermeable layer, ground injection was chosen, followed by the installation of sheet piles and bored piles for the car park. The excavation is then dug out. To keep the eastern tower stable, a bracing frame will be installed against the permanent sheet-pile walls. The floors will then be cast.” Construction of the Zuidasdok, which will take the A10 underground, is also due to start soon. “The tunnel box will pass just a few metres from ‘our’ façades. Collaboration with stakeholders, the layout of the construction site and monitoring will continue to require attention right up to completion.”

Sustainability
The construction site layout and associated logistics will need to be adapted seven times in total. Van Kats says: “We have found co-makers who can fully accommodate the schedule and logistics, such as De Groot en Visser, Unica and Voorbij.” The new façade of the hotel tower will be wind- and watertight this spring, with the ensemble scheduled for completion in 2021. “For a conversion to a hotel, which is challenging because of the interior fit-out, we can work relatively efficiently, including by storing materials on the floors in advance.” The office tower will receive a BREEAM ‘Excellent’ certificate, with, among other things, thermal energy storage combined with district heating and solar panels. The hotel will achieve a GPR score of at least 8. “Because of the complex surroundings and mix of functions, this is a unique project,” Thomas concludes. “The development of a new Amsterdam Zuid station will create a second passage linking north and south, bringing 2Amsterdam even closer to the centre of the Zuidas. The new entrances have been oriented towards the south, making better use of this central location. This makes 2Amsterdam the ultimate redevelopment, where every form of collaboration can come into its own.”

Question about this story? Ask your question

Who worked on it

2Amsterdam in Amsterdam, transformation

  1. delegated developerProvast
  2. ownerCommerz Real
  3. contractorJ.P. van Eesteren
  4. co-makerDe Groot en Visser
  5. co-makerUnica
  6. co-makerVoorbij
  7. clientSEGRO Benelux
  8. main contractorHercuton
  9. Architectural practiceMies Architectuur
  10. architectKCAP Architects&Planners
  11. all-round groundworks contractorVMV Projecten
  12. final fit-outGroenbedrijf Copijn

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • Project2Amsterdam
  • SubjectRenovation & conversion
  • CompanyProvast
  • CompanyCommerz Real
  • CompanyJ.P. van Eesteren
  • CompanyDe Groot en Visser
  • CompanyUnica
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.