Renovation & conversion

Climate control systems rebuilt from scratch:

Text Johan DebaerePhotography Werkendamse Verwarmings Industrie

Climate control systems rebuilt from scratch:

Sustainable heating and ventilation systems for rented apartments.

The social housing apartments in Tiel are getting not only a new façade and updated interiors with new kitchens, bathrooms and toilets, but also improvements to sustainability and energy efficiency. 

“The new façades and roofs are much better insulated and consequently more airtight. It is therefore important to ensure sufficient ventilation to optimise indoor air quality. That is why we are installing a demand-controlled ventilation system with heat recovery in every apartment,” says André van Hal, project manager at Werkendamse Verwarmings Industrie. “We also opted for low-temperature convector heaters connected to a communal heating system. They will heat the homes more evenly, consistently and sustainably than a traditional system, while also saving energy, especially because the water supply temperature is considerably lower than with conventional central heating.”

Low-temperature convector heaters connected to a communal heating system were chosen.

Systems completely rebuilt

Werkendamse, which became an independent entity within Kemkens Oss B.V. last year, has specialised for more than 50 years in the development and installation, as well as the maintenance and servicing, of central heating, climate control, air treatment, measurement and control technology, and sustainable energy systems. “We were commissioned for De Batouwe by main contractor De Vree en Sliepen and housing association Stichting Thius. We were involved in the project at an early stage, which meant we could contribute to the design of the systems,” says the project manager. “Preparations took a year and a half, and we started work just before the summer of 2020. The work is being carried out in several phases and will be completed before the summer construction holiday. This is an everyday project for us, but it is still unusual for all the systems to be completely rebuilt as part of a renovation.”

‘All the apartments are equipped with low-temperature convector heaters and demand-controlled ventilation with heat recovery’

Question about this story? Ask your question

Wie aan De Batouwe werkte

  1. housing associationStichting ThiusMentioned in Outdated sheltered housing given a new lease of life as sustainable social rented homes
  2. architectural practiceWagterKrijgerMentioned in Outdated sheltered housing given a new lease of life as sustainable social rented homes
  3. construction companyDe Vree en SliepenMentioned in Outdated sheltered housing given a new lease of life as sustainable social rented homes
  4. Interior fit-out specialistVan Ginkel AfbouwMentioned in Outdated sheltered housing given a new lease of life as sustainable social rented homes
  5. engineering and construction firmAtlasMentioned in Outdated sheltered housing given a new lease of life as sustainable social rented homes
  6. supporting concrete workKorenhof Betonbewerking en MontageMentioned in Outdated sheltered housing given a new lease of life as sustainable social rented homes
  7. installationDe Werkendamse Verwarmings IndustrieIn this story
  8. architectPieter WagterMentioned in All steelwork and balustrade work is carried out in-house
  9. welding and installation companyVan Pommeren Las & MontageMentioned in All steelwork and balustrade work is carried out in-house

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDe Batouwe
  • SubjectRenovation & conversion
  • CompanyDe Werkendamse Verwarmings Industrie
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.