More attractive, more sustainable and safer

Housing association Woonstad Rotterdam is renovating three blocks of flats in the Prinsenland district of Rotterdam.
The 495 homes in these so-called Prinsessenflats are set to see major improvements in their appearance, energy performance and (fire) safety. Six new homes suitable for people with disabilities are also being created.
The renovation of the Prinsessenflats is being carried out by a construction team. The team comprises Woonstad, Smits Vastgoedzorg, A3 Architecten, IMd Raadgevende Ingenieurs and Cauberg Huygen. “We worked together to develop the plans from the detailed design stage onwards,” says René van der Bijl, operational director at Smits Vastgoedzorg. “Work began in February 2020.”

A cohesive ensemble
Alexander van Engelen, property development project manager, is overseeing the renovation of the Prinsessenflats on behalf of Woonstad. He explains: “There are four Prinsessenflats in total. We renovated one of them a few years ago, including by installing an entirely new façade structure at the front and rear. This architectural appearance is being carried through to the three blocks we are now renovating, creating a cohesive ensemble.” Van der Bijl adds: “We are installing a prefabricated architectural concrete structure at the front and rear. This stabilises the existing balcony and access gallery structures and gives the blocks their intended appearance. At the same time, we are widening the balconies by around one and a half metres. The access galleries are being widened by approximately 40 centimetres and raised slightly, making them more accessible for people using, for example, walking frames.”
‘We are installing a prefabricated architectural concrete structure at the front and rear’
More sustainable and comfortable
The Prinsessenflats are in a so-called ‘Next Generation Neighbourhood’, an older residential area being prepared for the future. Van Engelen says: “To achieve this, we are giving particular consideration to sustainable and circular solutions. Solar panels are being installed on the roofs, for example. We are also exploring the possibility of reusing materials, such as office partitions that will be used as new walls for the storage units. The roofs are also receiving additional insulation.” The homes themselves are also becoming much more sustainable. They are being disconnected from the gas network and connected to the district heating network, which is supplied with waste heat from Rotterdam’s industry. The homes are also being fitted with new radiators, HR++ glazing, new balcony doors and a new ventilation system. Overall, the flats are moving up from an average energy rating of F to an average of A and A+.
Coronavirus protocol
Smits Vastgoedzorg is carrying out the work in two construction phases. The first phase covers work on the exterior and began in April 2020. The second phase involves improving the energy performance of the homes, making the service risers fire-safe and installing a video intercom system. “The second phase started a little later because of coronavirus,” says Van Engelen. “We first drew up a coronavirus protocol that residents would feel comfortable with. We offer them the option of staying with family or friends, or in temporary accommodation, while the work is under way. If residents stay in their homes, we take appropriate safety precautions if they wish.”
A golden triangle
On 1 June 2020, Smits Vastgoedzorg began renovating a number of pilot homes, with the aim of starting ‘in earnest’ after the summer building break, at a rate of three homes a day. Van der Bijl says: “We needed to work at that pace to finish before 1 October, the start of the heating season. We managed it, with only a slight overrun. From May, we will start work on the next block at a slightly slower pace of two homes a day.” He emphasises that the work is quite disruptive for residents, particularly in combination with the uncertainty surrounding coronavirus. “We are giving this a lot of attention. Together with Woonstad and the resident support provided by Ladies@work, we form a golden triangle, working to keep residents and the local community as well informed and involved in the renovation process as possible.”
A positive collaboration
A third of the work has now been completed. How do Woonstad and Smits Vastgoedzorg look back on this period? “With complete satisfaction,” says Van Engelen. “Collaboration within the construction team, and with the residents, has been very positive. We will continue to ensure it stays that way.” Van der Bijl agrees: “Completing the first block is a good opportunity to evaluate the work. We will use the resulting points for improvement to make the renovation of blocks two and three run even more smoothly.”
Question about this story? Ask your question
Wie aan Prinsessenflats werkte
- anchoring and installationKuijpers Uitvoering & AdviesMentioned in ‘Installing precast concrete elements is specialist work’
- engineeringIMd Raadgevende IngenieursMentioned in ‘Installing precast concrete elements is specialist work’
- coordinates the renovationSmits VastgoedzorgMentioned in A successful partnership between sister companies
- electrical installationsBiemond ElektroMentioned in A successful partnership between sister companies
- engineering and coordinationVH Prefab EngineeringMentioned in Buildable 3D model for a prefabricated concrete façade structure