Strong foundations, a solid future
Text Lieke van ZuilekomPhotography Franki Grondtechnieken

From pile foundations to retaining walls, injection works and ground improvement: with more than a century of experience and expertise, Franki Grondtechnieken is the leading expert in vibration-free foundation techniques.
The Franki Grondtechnieken success story began in 1908, when Edgard Frankignoul obtained the patent for the very first Franki pile. This driven pile with an enlarged base was used to deliver numerous high-profile projects in a short time. A global empire was also built, with subsidiaries and franchisees in foundation engineering and general construction, before being split up in the 1980s. Since then, Franki Grondtechnieken, founded in 1934, has focused exclusively on foundation engineering. The company is part of Franki Foundations Belgium, which has been part of BESIX Group since 2008.

The foundation for complex projects
Whether it is an extension to an operational petrochemical plant or hospital, a car park or high-rise development in the city centre, or a major infrastructure project involving tunnels and bridges, Franki Grondtechnieken demonstrates its added value above all on complex, specialist projects. “With our vibration-free techniques, we literally lay the foundations for these projects,” says Managing Director Jan-Wim Verhoeff. “A good example is the Spoorzone in Delft, where a 2,300-metre-long railway tunnel with an underground station and space for 4 tracks was built over almost 10 years. Excavating the tunnel was necessary to create this underground facility. Since installing and extracting sheet piles would have caused excessive vibration and noise, a vibration-free alternative from Franki was chosen. We excavated trenches up to 25 metres deep, into which concrete was pumped from below to create cast-in-situ panels. The 7.50-metre-wide panels formed a stable wall, which was then excavated to create the tunnel. We used a similar method to construct the walls for the stations on Amsterdam’s Noord/Zuidlijn. We also laid the foundations for the underground car parks at Lammermarkt and Garenmarkt in Leiden.”

From foundations to complete excavation pits
Franki’s vibration-free bored piles also provide the foundations for the high-rise The Student Hotel, built next to Eindhoven Central Station. They also underpin the OurDomain Rotterdam Blaak residential tower (formerly Bright), the final project in Rotterdam’s post-war reconstruction. “Our work on the RIVM tower in Utrecht is a good example of how we take on complete excavation pits as well as foundation engineering,” says Verhoeff. “For this project, we installed retaining walls for the excavation pit, including anchors. We also installed piles with a diameter of no less than 2 metres and a depth of 60 metres to meet the vibration limits. We sealed the ground by grouting it, then excavated the entire pit. This meant the contractor could start construction immediately.”
Most of Franki’s foundation techniques are formed in the ground. “We can also combine bored piles with precast elements, as required, to deliver a high-quality element without vibration. This technique is being used, among other places, on the ‘A16 Rotterdam’ project, between the A16 and A13, where we are installing around 10,000 combined piles as part of a foundation package with Voorbij Funderingstechniek.”
In-house engineering department
Taking into account factors such as building type, scale, location and ground conditions, Franki’s in-house engineers are happy to design a bespoke foundation for every project. “We also provide advice, for example when an alternative piling system would make construction cheaper, faster and/or quieter,” Verhoeff concludes. “We have more than 100 machines, owned or hired, ranging from megasized to extremely compact, so we can work on any construction site.”