Distribution centres

‘Precast concrete will have even wider applications’

‘Precast concrete will have even wider applications’

Precast concrete is the future. Hercuton knows this better than most. The precast concrete specialist started out exactly 25 years ago as a pioneer in commercial buildings. Since then, it has used innovation to help clients maintain a lasting advantage in sustainability, cost savings, efficiency, maintenance, appearance and value retention.

“We believe in concept-based construction,” says Ivo van der Mark, director of Hercuton, which is celebrating its anniversary. “We don't think it makes sense to reinvent the wheel for every project. We call our concept-based construction method LEGOisation. In effect, we have around six thousand different precast concrete building elements at our disposal, which we can combine in countless ways. With these elements, we deliver functional distribution centres and production facilities on a turnkey basis, as well as architectural masterpieces.” Fine examples include DHL's all-electric sorting centre in Zaltbommel, Imagewharf in Amsterdam (nominated for both BNA Beste
Gebouw 2019 and the Steden in Beweging (STIB) Award 2019), the main office for Airforce in Zaltbommel and the Euroscoop Cinema- &
Leisurecomplex in Amsterdam and Den Haag.

Main office Airforce, Zandvoort.

Ensuring quality

Over the years, Hercuton has specialised in the concept-based design and turnkey construction of commercial buildings in precast concrete. Van der Mark says: “We know what works and what doesn't. At the same time, we are constantly pushing our boundaries to ensure quality and exceed our clients' expectations. Our concept-based approach to building in precast concrete is ideally suited to this. It starts with the design process. Our elements have been fully thought through and are easy to integrate into a computerised 3D design environment. They are then manufactured in the factory under ideal conditions. Construction on site is simply a matter of logistics. The concrete elements are dimensionally accurate and therefore fit together perfectly.”

Euroscoop Cinema- & Leisurecomplex, Amsterdam

Keeping the schedule under control

“As well as quality, the schedule is easy to control,” Van der Mark continues. “Because we prefabricate, we can determine a great deal at the preliminary stage. After all, we know exactly which elements make up the design and when each one is needed. On that basis, we instruct the factory, which delivers on the specified day.” The efficiency Hercuton achieves with this construction method is further enhanced by involving architects and other parties at an early stage. By working collaboratively, processes are optimally coordinated, further reducing the risk of delays and failure costs.

All-electric sorting centre DHL, Zaltbommel.

Sustainable material

Precast concrete offers considerable benefits not only as part of modular and
integrated concepts, but also as a material in its own right. Van der Mark highlights its sustainable properties: “Take its high thermal mass, for example. This keeps our buildings cool in summer and makes it easy to maintain the right temperature in winter. In addition, our precast
concrete buildings are ideally suited to concrete core activation. Another advantage is that our precast concrete roofs are suitable for solar panels and multiple land use. Concrete is also low-maintenance, fire-resistant, secure against break-ins and recyclable.”

Three loft offices and a car park building at Imagewharf, Amsterdam.

New sectors

Asked what opportunities he sees for the future, Van der Mark replies: “The quality of concrete is continually improving, giving it even wider applications. Our clients already include production facilities, fruit and vegetable businesses, flower and plant businesses, logistics companies and companies that store hazardous substances.
I expect us to add clients from even more new sectors over the coming years.”  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectDistribution centres
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.