Construction is complete and the move has already taken place: retailer Welkoop, which specialises in garden and animal products, has relocated from Ede to its new distribution centre and service office in Apeldoorn.
Systabo B.V. carried out the construction. Together with its sister company VolkerWessels Logistics Development B.V., the contractor delivered a fully ‘built-to-suit’ project for end user Welkoop.
Welkoop has grown significantly in recent years, to the point that its premises no longer met its needs. The search for a new location led to Bedrijventerrein Apeldoorn Noord, which offers Welkoop a convenient central position in relation to its stores. A new distribution centre was built there to supply more than 150 stores. The new-build project comprises a 19,500 m² warehouse, a 3,300 m² service office and an adjacent car park with 185 spaces. The service office includes various open-plan office areas, meeting rooms, a canteen and a test store.
Agile delivery
Systabo started construction in December 2019, says development planner Vincent Kenkhuis. “We have been involved in the project from the outset. As the construction partner, we contribute our technical expertise to deliver an optimal building, starting from the initial design concept. Throughout the design and construction process, the client’s requirements and taking care of the client are central to every decision. Careful BIM preparation with our regular LEAN supply-chain partners enabled us to deliver the project quickly and efficiently.” The distribution centre, which covers an area the size of three football pitches, has two loading and unloading sides and is designed to keep inbound and outbound goods flows completely separate. Kenkhuis adds: “In consultation with Welkoop, we incorporated a number of tenant requirements during construction. For example, racking was installed in the warehouse while the project was being fitted out, and Systabo delivered the complete office fit-out on behalf of the end user.”

Hybrid system
The warehouse and office were designed and built to meet the BREEAM ‘Very Good’ standard. “This is evident, among other things, on the roof, where more than 6,000 solar panels have been installed. The warehouse has a hybrid system. An air-source heat pump is sufficient for 90% of the time. Gas is only used to supplement heating during peak periods in a severe winter. This, too, was a specific requirement from the user, who did not want to be 100% dependent on a single heating system.” He also points to the swales on the site, which facilitate water infiltration and storage. Sustainable materials were used wherever possible during construction.
Construction method
As Kenkhuis noted, the construction process went smoothly. Did the coronavirus cause any delays? “Some materials did arrive later, of course, but we were able to make up for this by bringing other tasks forward. Measures such as maintaining social distancing were followed properly on site. Meetings were held online wherever possible.” Systabo used its standard construction method for the project: “When building this type of large-scale structure, the various subcontractors work in sequence according to a coordinated schedule. Thanks to our BIM approach combined with LEAN, every supply-chain partner knows when and what is expected of them.” With its new distribution centre and service office, Welkoop is ready for the future, Kenkhuis concludes. “There are now around 150 people working here, with room for more. The growth of the product range has also been taken into account.”
Project details
Client
VolkerWessels Logistics Development B.V., Amersfoort
End user/tenant
Welkoop Retail B.V., Ede
Architect
Leferink Architecten BNA B.V., Oldenzaal
Contractor
Systabo B.V., Enschede
Structural engineer
Snetselaar Constructieve Ingenieurs B.V., Ede
Building services
Van Dalen Installatietechniek B.V., Nijkerk