Op Bedrijventerrein Apeldoorn Noord werd ten behoeve van de bevoorrading van ruim 150 winkels een nieuw DC gerealiseerd.
Op Bedrijventerrein Apeldoorn Noord werd ten behoeve van de bevoorrading van ruim 150 winkels een nieuw DC gerealiseerd.

Construction is complete and the move has already taken place: retailer Welkoop, which specialises in garden and animal products, has relocated from Ede to its new distribution centre and service office in Apeldoorn.

Systabo B.V. carried out the construction. Together with its sister company VolkerWessels Logistics Development B.V., the contractor delivered a fully ‘built-to-suit’ project for end user Welkoop.

Welkoop has grown significantly in recent years, to the point that its premises no longer met its needs. The search for a new location led to Bedrijventerrein Apeldoorn Noord, which offers Welkoop a convenient central position in relation to its stores. A new distribution centre was built there to supply more than 150 stores. The new-build project comprises a 19,500 m² warehouse, a 3,300 m² service office and an adjacent car park with 185 spaces. The service office includes various open-plan office areas, meeting rooms, a canteen and a test store.

Agile delivery

Systabo started construction in December 2019, says development planner Vincent Kenkhuis. “We have been involved in the project from the outset. As the construction partner, we contribute our technical expertise to deliver an optimal building, starting from the initial design concept. Throughout the design and construction process, the client’s requirements and taking care of the client are central to every decision. Careful BIM preparation with our regular LEAN supply-chain partners enabled us to deliver the project quickly and efficiently.” The distribution centre, which covers an area the size of three football pitches, has two loading and unloading sides and is designed to keep inbound and outbound goods flows completely separate. Kenkhuis adds: “In consultation with Welkoop, we incorporated a number of tenant requirements during construction. For example, racking was installed in the warehouse while the project was being fitted out, and Systabo delivered the complete office fit-out on behalf of the end user.”

A new distribution centre was built at Bedrijventerrein Apeldoorn Noord to supply more than 150 stores.

Hybrid system

The warehouse and office were designed and built to meet the BREEAM ‘Very Good’ standard. “This is evident, among other things, on the roof, where more than 6,000 solar panels have been installed. The warehouse has a hybrid system. An air-source heat pump is sufficient for 90% of the time. Gas is only used to supplement heating during peak periods in a severe winter. This, too, was a specific requirement from the user, who did not want to be 100% dependent on a single heating system.” He also points to the swales on the site, which facilitate water infiltration and storage. Sustainable materials were used wherever possible during construction.

Construction method

As Kenkhuis noted, the construction process went smoothly. Did the coronavirus cause any delays? “Some materials did arrive later, of course, but we were able to make up for this by bringing other tasks forward. Measures such as maintaining social distancing were followed properly on site. Meetings were held online wherever possible.” Systabo used its standard construction method for the project: “When building this type of large-scale structure, the various subcontractors work in sequence according to a coordinated schedule. Thanks to our BIM approach combined with LEAN, every supply-chain partner knows when and what is expected of them.” With its new distribution centre and service office, Welkoop is ready for the future, Kenkhuis concludes. “There are now around 150 people working here, with room for more. The growth of the product range has also been taken into account.”  

Project details

Client
VolkerWessels Logistics Development B.V., Amersfoort

End user/tenant
Welkoop Retail B.V., Ede

Architect
Leferink Architecten BNA B.V., Oldenzaal

Contractor
Systabo B.V., Enschede

Structural engineer
Snetselaar Constructieve Ingenieurs B.V., Ede

Building services
Van Dalen Installatietechniek B.V., Nijkerk

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectDistribution centres
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.