JG Timmer built a new distribution centre with offices in Tiel for furniture importer Zijlstra Lefin B.V. The building has a total floor area of around 12,000 m2 and is connected to the existing building by an airlock. “We handled the drawings for the project’s distinctive architectural detailing ourselves.”

Construction began in August 2023, and the entire building was officially handed over in December 2024. The warehouse had already been in use for six months by then. JG Timmer project manager Pieter Kool: “At the time, this was the largest commercial building we had completed, and it is a good stepping stone to even larger projects. Construction went very smoothly. We had good communication with the client and our colleagues in the project team. We always try to be flexible, so that we can still make adjustments during construction and ultimately deliver a building that meets all the client’s requirements. As with any construction project, there were a few challenges, but no significant problems in this case.”

Ultra-flat concrete floor

The building consists of a steel structure clad in sandwich panels. Given the building’s height of 17 metres and its use as a warehouse, an ultra-flat concrete floor was cast in situ. This prevents fluctuations when operating forklifts at height. A mezzanine floor was installed above the loading docks, with the showroom and offices located on it. These areas have hollow-core concrete floors topped with anthracite-coloured concrete, which also serves as the finished floor. From the office, employees can look straight into the distribution area. 

Industrial look with a luxurious feel

The stairwells and lifts feature exposed precast concrete, creating an industrial look with a luxurious feel. The outside of the office section is made up of aluminium curtain walls with extensive glazing. Kool: “Large balconies are suspended at the rear of the office space, and mounting them as cantilevers presented quite a structural challenge, especially in combination with the curtain walls extending right to the top. This distinctive architectural detailing is what makes it such an attractive project. We produced the drawings for it ourselves.”

The entire building is heated with wood pellets. JG Timmer built a 17-metre-high concrete silo for the pellets, which are blown into it to heat both the office space and the warehouse. Kool looks back on the project with satisfaction. “We worked with companies we partner with regularly, and that always makes for a pleasant process. The client even allowed us to put forward companies ourselves for the electrical and mechanical installations, refrigeration technology and sprinkler system.”  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectDistribution centres
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.