De warehousevloer wordt een dag na het storten voorzien van een stofbinder.
De warehousevloer wordt een dag na het storten voorzien van een stofbinder.

Hercuton is building a new head office and distribution centre for MTS Euro Products on the De Dijk industrial estate in Maassluis.

Thanks to a carefully balanced floor design and the application of a special dust binder to the top layer of the floor construction, the supplier of hygiene products is assured of a dust-free warehouse floor. We speak to Jeroen Boers of Twintec Nederland, responsible for installing the monolithic floors with a ten-year performance guarantee.

Twintec is providing around 26,000 m2 of monolithic flooring for the new distribution centre, including more than 19,000 m2 of warehouse floor, to be built as a hybrid floor with basic reinforcement and steel fibres to flatness class DIN 18202, line 4. “The basic design for the piled floors was prepared by ABT, a renowned engineering firm with expertise in floor design,” says Boers. “We adopted the design as a starting point, checked it and developed it further so that we could ultimately provide our Design, Build and Guarantee performance guarantee for the finished floor. This means the end user will not have to worry about the floor for ten years.”

Twintec is providing around 26,000 m2 of monolithic flooring for the new distribution centre.

An engineering challenge

The floor design is characterised by a relatively large pile grid, says Boers. “To achieve a balanced design, we use thickened pile heads. The floor is thickened above the piles to accommodate the point loads. This avoids having to make the entire floor thicker. It is, quite literally, an engineering challenge to achieve the optimum result. A total of 5,000 m3 of concrete will be placed in fifteen phases. The warehouse floor will be laid in nine pours, the loading bay pit construction (3,000 m2) in two pours, and the structural topping layers (4,000 m2) in four pours. The warehouse floor will be treated with a dust binder one day after pouring. This adds strength to the top layer and prevents premature wear and the resulting dust formation.”  

Have a business enquiry for Twintec? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectDistribution centres
  • CompanyTwintec
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.