Large dimensions are more the rule than the exception in the construction of distribution centres. But a height of 35 metres is extreme even in the world of logistics. For transport company Coenen Boxmeer, it is a way to make maximum use of the available ground area.
Coenen Boxmeer is moving from Boxmeer to Laarakker business park in Haps. Here, it is taking a 23,000 m² plot in a prominent location beside the A73. Martens Bouw has been tasked with building a fully automated warehouse for chilled and frozen products. The distribution centre will also be sustainable. The automated cranes and conveyor belts operate with minimal heat loss. Solar panels will be installed on the roof, and waste heat will be used to heat the offices, packaging hall and truck wash.

An attractive building
Because the distribution centre is being built in a prominent location, Martens Bouw, which won the project under a Design & Construct contract, was specifically asked to give it an attractive appearance. “That gave us the idea of varying the heights,” says Peter Martens, director and owner of Martens Bouw. “The stepped arrangement of the dispatch building, order-picking building and office was an immediate hit with both Coenen and the Welstandscommissie.” The dynamic Dri-Design façade panels also give the new build character.
A solid foundation
The dispatch building required a substantial foundation capable of supporting everything installed in the 35-metre-high building. Martens explains: “A piled foundation would have been complex and costly. It proved more efficient to excavate the soil to a depth of 3.5 metres, mix the excavated sand with a binding agent and compact it back into place. This created a foundation with a very high load-bearing capacity. Setting it out was a challenge. We had a tolerance of less than 10 millimetres in every direction, an extremely small margin across such a large area.”
The dispatch building is being constructed using the silo-building method. The racking supports the façades and roof. An insulated partition separates the chilled storage area from the large freezer. The multishuttle system, which transports boxes, is located at the centre of the building.

Three construction streams
Time pressure is an additional challenge. To meet the deadline, Martens Bouw is working in three construction streams. This means dealing with large quantities and extreme dimensions. “The site is actually very spacious,” Martens says. “But because of the large volumes, the insulation panels still had to be delivered just in time. They also catch a lot of wind, especially at height. We had to suspend installation several times.”
Covid is no longer a challenge, but that does not make it enjoyable, Martens says. “Only a few people attend meetings in person; the others join via Teams. But we should be glad that this option is available. It has helped us stay on schedule. During the forthcoming summer construction holiday, Coenen will be able to bring the freezers down to -20°C.”
Project details
Client
CB Greenwarehouse & transportbedrijf Coenen, Boxmeer
Design & Build
Martens Bouw, Beugen
Lead structural engineer
Ingenieursbureau Verhoeven en Leenders, Volkel
Civil engineering
RvB Infra Harderwijk, Harderwijk
Refrigeration and freezer installations
Top Cold Control, Nieuwkuijk
Electrical installations
Elektro Technisch Buro Nabuurs, Boxmeer
Mechanical installations
Gebr. Janssen, Beugen
Construction period
September 2020, July 2021