Distribution centres

DL/Jocotrans new build integrates seamlessly into its surroundings

DL/Jocotrans new build integrates seamlessly into its surroundings

The new sustainable logistics centre for DL Logistics Group and Jocotrans was completed at the end of February on Botter in Bodegraven. ASK Romein Bouw delivered a 7,000 m² new build, with 600 m² of offices and space for 7,000 pallet locations, 16 cold and freezer rooms, and 11 loading docks with inflatable shelters and dock doors, on behalf of developer Dammes Laban Van Uden Onroerend Goed CV. “We developed and delivered this project on a turnkey basis,” says Marcel Michielsen, Managing Director of ASK Romein Bouw.

“Working with our client, we pursued an open and transparent process, within an agreed budget, to deliver a high-quality, distinctive new build with the highest possible sustainability rating: BREEAM-NL ‘Outstanding’,” says project manager Dylan Boudens. “The new build is founded on vibro piles. To install the floor structure, we supported it on high-speed piles. We then erected the steel frame, dividing it into compartments to separate the cold and freezer rooms. High-performance Kingspan QuadCore™ panels were used between the cold and freezer rooms, where they also serve as fire barriers. The roof structure combines QuadCore™ panels above the freezer rooms with steel roof decks and high-performance insulation above the cold rooms. Both roofs were finished with a single-ply membrane.” At the municipality’s request, the building was not finished as a grey box, but given a distinctive façade. “The use of sandwich panels alongside concrete panels with a high-quality brickwork texture means the building’s look and feel blend seamlessly into its surroundings.” The offices are surrounded by curtain walls.

Oorspronkelijk stonden de silo’s maar een paar meter verderop op het eiland.

The new build has 11 loading docks with inflatable shelters and dock doors.

Particular attention was paid to the floor, which had to have an exceptionally flat finish while also incorporating the infrastructure for the mobile racking. “Instead of fixed pallet racking, this project uses mobile racks that can be moved easily along rails cast into the floor. This also allows the aisles to be used for storage, enabling DL/Jocotrans to make maximum use of the available space.”

BREEAM-NL ‘Outstanding’

To achieve the high level of sustainability, a BREEAM-NL expert advised the team during the design and construction phases. “This project makes sustainable use of waste heat,” says Michielsen. “The new build for DL Logistics Group and Jocotrans has an average heating demand. Waste heat from the refrigeration units serving the cold and freezer rooms is used to heat the offices, in combination with underfloor heating. This provides even heating throughout the offices and is also the most efficient way to heat them. No gas or electricity is used for heating. Only the heat exchanger is powered by electricity.” The waste heat is also used to defrost the coolers. Heat for the underfloor heating beneath the cold and freezer rooms is also recovered from the refrigeration system, says Boudens: “QuadCore™ panels with a high Rc value have been used in the building. Around 2,000 m² of PV panels will be installed on the roof, each with a peak output of around 275 Wp. Finally, energy-efficient LED lighting has been installed throughout the building. Careful positioning of the luminaires has minimised both their number and energy use per m² of floor area.”

Met de silo’s op het dak is het project een icoon voor het industriële verleden van het Cruquiuseiland.

The interior of the new build has also been finished to a high standard.

Developed in BIM

“Given the ambitious BREEAM-NL target, the complexity and the short timescale, we decided to develop this new build in detail using a Building Information Model (BIM), with all subcontractors and other contractors participating,” says Michielsen. “The ultimate aim was to improve the construction process by minimising clashes and costs caused by errors, significantly shortening the programme, and maximising quality and value for the client.”

Construction began in June 2019. “The preparation period was short, but because we work with our own structural engineers, BIM department, design department and engineers, who contribute throughout the process, we were able to respond very quickly,” says Michielsen. “Construction went smoothly. The building work and (internal) logistics were well coordinated, and we worked very well with our subcontractors, other contractors and the client. The fact that this is appreciated is reflected in several follow-on projects that are now in the pipeline.”   

Een zakelijke vraag aan Kingspan Light + Air? Neem contact op

Wie eraan werkte

Logistiek centrum DL/Jocotrans Bodegraven in Bodegraven-Reeuwijk

  1. QuadCore™ panelenKingspan
  2. ontwikkelaarDammes Laban Van Uden Onroerend Goed CV
  3. contractorASK Romein Bouw

Blijf dit volgen

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

What you follow
  • ProjectLogistiek centrum DL/Jocotrans Bodegraven
  • SubjectDistribution centres
  • CompanyKingspan Light + Air
  • CompanyDammes Laban Van Uden Onroerend Goed CV
  • CompanyASK Romein Bouw
Deel dit artikel

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.