Installations engineering and cleanrooms in a joint venture

The installations engineering and construction of the cleanrooms for the Pharmaceutical Centre at Antoni van Leeuwenhoek Hospital (AVL) were jointly awarded to the Breman Utiliteit and ClimaTech bv joint venture. The joint venture supplied the various technical gases, mechanical, electrical, control, cleanroom and decontamination systems, as well as the laboratory and cleanroom fit-out.
Roy Voss of D&E Interim Project Support acted as project manager on behalf of the joint venture: “A neutral third party with the expertise to represent both parties in dealings with the client.” Breman and ClimaTech had also worked together in 2014, when they were jointly responsible for delivering a pharmacy at Slotervaart Hospital.
The verification phase was a key part of the overall process. Voss: “AVL and Royal HaskoningDHV prepared the technical design and specifications and put the project out to tender. After preselection, the Breman-ClimaTech joint venture went through a three-month verification phase to identify omissions and optimise the design. The contract was awarded on that basis. It was an excellent process because it meant sitting down with the client and advisers, sharing responsibility for the design and making the most of Breman and ClimaTech’s construction expertise. For example, during the verification phase we found that a mobile decontamination unit would enable us to disinfect rooms and materials more efficiently and with better control over dosing than a fixed installation.”
GMP guidelines
Both the pharmaceutical manufacturing facility and parts of the laboratory comply with the stringent GMP guidelines. Voss: “Before everything can be signed off in accordance with those guidelines, each component must go through a lengthy, complex process of assessment, review, physical testing, reporting, administrative processing and validation. It is reassuring to work with companies such as Breman and ClimaTech, which have proven themselves on comparable projects.”
Air pressure zones
Most of the building services are located on the fifth floor. Voss: “That is where the central air handling units, compressed air system, heating and cooling distribution systems, and control cabinets are located. The pharmacy building uses the heating and cooling generation systems in the existing AVL buildings. All connections were identified at an early stage, and work plans were drawn up with the facilities management team to prevent disruption to systems that were still operational. A dedicated system was also installed to regulate pressure in the laboratories and cleanrooms, where different pressure classes apply. This system ensures that wind loads on the façade do not affect the air pressure hierarchy in the building, and therefore do not disrupt the production process.”
Flush
The laboratory spaces and compounding pharmacy have been finished to the most stringent standards. Flush-finished steel walls were chosen, with a coating suitable for processes including VHP (disinfection with hydrogen peroxide). The architect incorporated a great deal of glass into the design, and this too is flush-fitted into the walls. To optimise internal logistics, ClimaTech installed pass-through cabinets and pass-through refrigerators.
Room to build
Working as a specialist subcontractor alongside main contractor De Vries en Verburg and MER specialist All IT Rooms, the joint venture enjoyed excellent collaboration. Voss: “It starts with giving each other room to build. We agreed that, as with the shell construction, the fit-out would proceed from the bottom up, so that, for example, when installing the services infrastructure, you would not have to work around stacks of plasterboard. That way, everyone can get on with the work, which also improves quality. When you coordinate these kinds of things properly, the people on site are mostly smiling.”
Have a business enquiry for Breman Installatiegroep? Get in touch
Who worked on it
Farmaceutisch Centrum
- building services engineering
Breman - building services engineeringClimaTech bv
- building contractorDe Vries en Verburg
- Environmental impact assessment specialistAll IT Rooms
- clientAntoni van Leeuwenhoek Ziekenhuis (AVL)
- project managerD&E Interim Project Support
Keep following this
Get an email when a new story is published. No account needed.
- ProjectFarmaceutisch Centrum
- SubjectGeneral
- CompanyBreman Installatiegroep
- CompanyClimaTech bv
- CompanyDe Vries en Verburg
- CompanyAll IT Rooms
- CompanyAntoni van Leeuwenhoek Ziekenhuis (AVL)