General

Building services at pace

Text Els HekkenbergImage Bogro, Ringnalda fotografie

Building services at pace

A new residential complex with 528 apartments, commercial space and a green courtyard is being built at Osdorpplein in Amsterdam Nieuw-West. Heddes Bouw & Ontwikkeling brought in Bogro’s specialists for the building services.

Bogro has been involved in the project since 2021. “Being brought on board so early says a lot about the trust in our collaboration,” says commercial director Kevin Duits. “We work closely with Heddes Bouw as part of a construction team. Our staff know each other well, which makes working together enjoyable. That matters especially on a project of this scale.”

New build in the city centre

Osdorpplein town centre in Amsterdam Nieuw-West is being redeveloped and will undergo a complete transformation in the coming period. On the site of the former district office, Heddes Bouw & Ontwikkeling is delivering the MIX Amsterdam project for client MRP. The design is by De Architecten Cie. The project comprises 528 homes, including 162 for social rent, a communal courtyard, a public bicycle parking facility with space for more than 400 bicycles, and more than 380 additional parking spaces.

15 apartments every week

The bulk of the building services work involves installing the heating and cooling systems in the apartments, says project manager Abdel El Faghloumi. “We supply and install the complete system, with underfloor heating and controls for each room. The bedroom, the living room: everything can be adjusted separately.” The system will be connected to a heating and cooling system. Bogro also installs these systems itself on other projects. “So we have a great deal of expertise in-house.”

Bogro is installing more than 300 kilometres of pipework in total. The pace is brisk: building services are being installed in 15 apartments every week. “That is why we also have a lengthy preparation period. This preparation is crucial on projects like this. Once work gets under way, it runs like clockwork,” says El Faghloumi.

The technical building services require extensive coordination in advance. “That is why it is crucial to work with the various parties at an early stage and as part of a construction team. This ensures that all the systems are coordinated with one another and with the building. Every project is a puzzle, but we do projects like this regularly. Our people know how it works.”

Tight logistics

Building in Amsterdam also requires meticulous logistics planning. The materials needed for the building services are delivered to site just in time. “Transport is always a challenge on projects in the city centre. Everything has to be perfectly coordinated,” explains El Faghloumi. “We notify the site manager on this project of our deliveries in advance.” Duits adds: “We have our own transport from our workshop, so we are not dependent on third parties and can keep everything in our own hands. That is our strength in every sense.”

A reliable construction partner

MIX Amsterdam is not an exception: Bogro works on a wide range of projects in residential and non-residential construction, from villas to apartment blocks. “Whatever the building, we can bring our expertise to bear,” says Duits. “We deliver dozens of projects a year, through established relationships as well as good collaboration. That is our strength.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.