Movianto, a logistics service provider in the pharmaceutical, biotechnology and healthcare industries, is growing. Following the opening of a new distribution centre in Weert, the healthcare specialist has recently expanded its warehouse capacity in Oss with approximately 13,000 m2 of new-build space. The new logistics hub, named Oss2, has been built as an extension to Movianto’s existing site. This has almost doubled storage capacity, from 16,000 to nearly 30,000 m2 of usable floor area. The extension was built by Bouwbedrijf van de Ven and comprises 11,845 m2 of industrial space with different temperature zones, 4,135 m2 of mezzanine floors, 1,400 m2 of office space and an ADR area for storing hazardous substances. The entire distribution centre is equipped with advanced automation and technology.
Logistics property specialist WDP Development NL is supporting Movianto’s logistics ambitions and has delivered a brand-new distribution centre in Oss that meets Movianto’s exact requirements and needs. WDP contacted its long-standing partner Bouwbedrijf van de Ven at an early stage to carry out the project. The company also built the existing warehouse in 2012. “Our commission began with a standard WDP design featuring a single mezzanine floor and a small office,” says Toon van Hout, Project Manager at Bouwbedrijf van de Ven. “Once Movianto was confirmed as the tenant, the design was developed through a close construction team partnership into a bespoke warehouse with an additional mezzanine floor, a passenger lift, a goods lift and an extensive office wing. Cooling systems using natural refrigerants were also installed throughout the industrial areas. The warehouse also includes a separate cold room maintained at a constant temperature of 4°C. We insulated the ground floor specifically for this room and built a large plant room to house all the refrigeration equipment.”

Approximately 640 tonnes of steel
Construction began in mid-January 2022 with groundworks for the foundations. “The new building has strip foundations and pad foundations bearing on the ground,” says Van Hout. “On top of these, we erected a steel frame weighing approximately 640 tonnes, with first-floor (2,750 m2) and second-floor (1,385 m2) hollow-core concrete slabs. The warehouse is spanned by a steel roof structure with steel roof sheets, PIR insulation with FM Approval certification and 1.5 mm PVC, onto which solar panels can be installed in the future.”
The façades are largely made up of insulated concrete panels and insulated sandwich panels, combined with aluminium curtain walling and glazed façades at the entrance and offices. “The offices were handed over fully fitted out, including metal stud partitions, glazed partitioning, suspended ceilings, tiled floors and carpeting,” says Van Hout. “At the junction between Movianto’s new and existing premises, we built a fire wall of reinforced autoclaved aerated concrete. We also created several openings here to optimise goods transport.” The ADR area is also separated by an autoclaved aerated concrete fire wall, which extends above the roof. The site around the warehouse is fully enclosed by fencing. “Asphalt was chosen for most of the site surfacing. We also provided a bicycle shelter and parking spaces, as well as a 2,100 m2 loading and unloading area with 14 docks.”

Exceptionally flat floors
To ensure fast product handling, maximum accessibility and high storage capacity, Movianto opted for a narrow-aisle warehouse. “This placed particular demands on the flatness of the warehouse floors,” says Van Hout. “Even a small unevenness can have major consequences at maximum lifting height. This was given particular attention both during the design phase and throughout construction.”
Excellent collaboration, outstanding result
The entire new-build project was completed in less than 10 months. “The keys were officially handed over on Friday 2 December, and together with client WDP and tenant Movianto, we raised a glass to a successful collaboration and an outstanding result.”
A business enquiry for Hoppenbrouwers Techniek BV? Get in touch
Who worked on it
Oss2 in Oss
- Electrical installationsHoppenbrouwers Techniek
- Sprinkler systemsABBS Nederland
- ClientWDP Development NL N.V.
- ArchitectPepers Architecten
- Structural engineerBouw-adviesbureau van der Zanden BV
- ContractorBouwbedrijf van de Ven B.V.
- Steel structureLammers Constructie
- Mechanical installationsVan Thiel Optimaal
- Climate control systemVoets en Donkers Koeltechniek BV
Keep following this
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectOss2
- SubjectDistribution centres
- CompanyHoppenbrouwers Techniek BV
- CompanyABBS Nederland B.V.
- CompanyWDP Development NL N.V.
- CompanyPepers Architecten
- CompanyBouw-adviesbureau van der Zanden BV