The RIVM’s main building has four reinforced-concrete cores. Austria’s Gleitbau was involved at a very early stage of the project and was able to provide valuable input on the core design. Gleitbau was responsible for the entire construction process.

The main building’s approximately 77-metre-high reinforced-concrete cores were built using Gleitbau’s slipform system in two successive sliding sections, from March to May 2019. The cores were constructed at a maximum rate of 3.9 metres per 24 hours.

“Close collaboration before construction began was an important part of the project,” says Gerold Pfister of Gleitbau. “By involving our engineers during the planning phase, we saved a great deal of time and eliminated many issues that could have caused problems during construction. For example, two smaller sections, each approximately 20 metres high, were completed in a separate construction phase from October to November 2019.”

Complete construction

In addition to assembling and operating the slipform, all materials supplied by the client (concrete, reinforcement and installation components) were incorporated or installed. Due to the site conditions, a concrete distributor had to be lifted with the formwork for the main building core so that the concrete could be placed as required while the formwork moved, without the support of a crane. Special concrete corbels were also built to support prefabricated elements. This construction method saved a great deal of time. All temporary materials that were not to remain in the structure were removed as the formwork moved.

Tailored to the client

Pfister: “Every project carried out by Gleitbau Salzburg is tailored to the client and has to be planned to meet specific requirements. Given the size of the structure, the complexity of the construction and the large number of materials to be installed, this project can certainly be described as unique. Close cooperation between our site team and the client was crucial to completing the reinforced-concrete cores without any significant problems and within the planned timeframe. The client’s high quality standards were fully met.”   

Question about this story? Ask your question

Who worked on Hoofdgebouw RIVM

  1. Complete deliveryGleitbauIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectRIVM headquarters
  • SubjectGeneral
  • CompanyGleitbau
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.