General

BouwBeurs is getting closer. This year’s theme is ‘Time to join forces’.

BouwBeurs is getting closer. This year’s theme is ‘Time to join forces’.

A theme that is right up our street. Together with our co-makers, we pool our strengths to create a more efficient building process. Collaboration is in our DNA, not only within our company, but with everyone associated with Faay.

We do not see collaboration as a weakness. Joining forces is essential and brings significant benefits, not only for our partners and ourselves, but also for the client. Our new Kingsize wall is one example of collaboration. An innovative idea was developed further and ultimately led to a new floor-to-ceiling, wall-to-wall ‘XL wall’, which we launched last year.

“We need to work together more
and encourage one another.”

The panel was developed in part through the collaboration of the ICB development group. This is a concept focused on controlling the building process. The aim is to improve quality and save time through process innovation. Achieving this requires close collaboration within a permanent team of supply chain partners. Together with ICB partners Hegeman, Löwik, VBI and Eaton, we are working towards a One-Piece-Flow construction method.

Floor-to-ceiling and wall-to-wall
A shortage of workers on site means that clients are increasingly requesting wider wall panels, to minimise the labour required, the coordination of the various trades, logistics and risks on site. This is a structural development in the construction industry that Faay actively supports. The Kingsize wall has gradually taken shape as a result. Like the ‘standard’ Faay panel, the shell-grade prefabricated XL panels have a core of flax shives with a fibre-reinforced top layer on each side. With the Kingsize wall, Faay is focusing more on concept-based projects and shell construction. The top layer of the Kingsize wall has therefore been treated with a water-repellent coating. The walls can be supplied at storey height (3 m1) and room width (up to 4.5 m1). “Slots for pipes, services and electrical boxes, rebates, it’s all included, wherever the client wants it.

Building more intelligently and affordably
These panels make construction faster and easier. They are the solution to labour shortages on site. ‘This way of building depends on good preparation. The sequence of construction is more important than ever. If we coordinate everything at an early stage and use BIM, we can achieve a smooth and fast building process.’

A business enquiry for Faay Vianen B.V.? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
  • CompanyFaay Vianen B.V.
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.