The course of a construction project depends on various factors

Floors in the existing and new car parks are being finished with similar coating systems
The course of a project can never be determined precisely in advance. It depends on a great many factors. For the construction of the new car park with superstructure, project developer Peter van Dijk was able to call on a team of knowledgeable and committed construction partners. SealteQ Noord was commissioned by the municipality of Emmen to renovate the floors of the existing car park, and was also approached by AKOR bouw to finish the floors in the new-build project using a similar coating system.

All the ramps were treated with an epoxy wear layer broadcast with Amaril.
Location, climatic conditions, season, planning, the involvement of employees, suppliers and the client, the coating system: these are all factors that make each project unique. Over the years, SealteQ Group has completed and renovated many car parks. “Over the past 40 years, we have evolved from specialists in concrete renovation and repair, waterproof injection of groundwater leaks and floor finishes into a leading provider of life-extending maintenance for concrete and steel. We have completed many different projects throughout the Netherlands,” says project manager Harald Hoogeveen. “The municipality of Emmen approached us to renovate the floors on levels -1 and -2 of the existing car park beneath Willinkplein/Raadhuisplein, covering 10,000 m². As AKOR bouw is building a new car park of approximately 5,000 m² against the existing basement, it also contacted us to finish the car park floor in this section with a similar coating system from Master Builders Solutions (BASF).”

SealterQ Noord also finished the car parks with parking bays, arrows, footpaths, zebra crossings and all the necessary pictograms.
Attention to detail throughout
The work began with mechanical preparation and dust-free cleaning of the floors. A substantial epoxy scratch coat was then applied and fully broadcast with aggregate. The floors on level -2 of the existing car park and level -1 of the new car park were finished with a hard-wearing coating, type MasterSeal Traffix 2273 from Master Builders Solutions (BASF).
On the level -1 floor of the existing car park (the intermediate deck), the specialist applied a crack-bridging solution similar to the product mentioned above, but with an additional membrane interlayer, type MasterSeal Traffic 2264. Finally, SealteQ Noord finished the floors with parking bays, arrows, footpaths, zebra crossings and all the necessary pictograms, and treated all the ramps with an epoxy wear layer broadcast with Amaril. “We started work on the first phase of this project at the end of January. On average, we had teams of 6 people working on site, including a working foreman. For the application of the crack-bridging membrane in the third and final phase, we deployed a team of 8,” says Hoogeveen. “We recently completed another project in Zeist and are working on two sites in Enschede and one in Deventer. We were also involved in renovating the Van Heek car park in Enschede, a car park on Westerstraat in Emmen, UMCG Noord/Zuid and CiBoGa in Groningen, as well as many other car park and industrial floor projects of medium and large scale throughout the Netherlands.”