Vanwege het woningtekort voor ouderen is besloten één van de bestaande vleugels uit te breiden met een extra verdieping met negen appartementen.
Vanwege het woningtekort voor ouderen is besloten één van de bestaande vleugels uit te breiden met een extra verdieping met negen appartementen.

Logistical and safety challenges

Adding an extra storey to an occupied building in Amsterdam is no problem for Jurriëns Midden. “It’s a challenging puzzle, but so far everything is going well.”

The building on Lowaard in Amsterdam-Buitenveldert is owned by the Elisabeth Otter Knoll Stichting. The foundation was originally established to provide housing for ‘respectable ladies who, through no fault of their own, were unable to support themselves’. Today, the building is home to older people who can access care if needed. “Because of the shortage of housing for older people, it was decided to add an extra storey with nine apartments to one of the existing wings,” says project manager Derk Westland of main contractor Jurriëns Midden. “The first plans were drawn up about four years ago, and we were able to start in March 2025. We are building at a fairly rapid pace: the timber-frame structure is made in the factory, and the façade elements arrive on site complete with brick slips, window frames and glazing. Most of the work will be in the interior fit-out. Completion is scheduled for week 46.”

Because of the shortage of housing for older people, it was decided to add an extra storey with nine apartments to one of the existing wings.

Minimising disruption

The residents, single people and couples aged between seventy and one hundred, can remain in their homes during the works. This calls for clear communication. “As well as adding the extra storey, we are replacing the central heating boilers and flue ducts in all the existing apartments. So we have to enter every home, and people will be without a boiler for two days. We deliberately did this during the summer months to minimise disruption, but it is quite a challenge. We send out our schedule each week, including an indication of the expected noise levels. The foundation can use this to plan outings, for example.”

A new lift will provide access to the new storey. This required an additional lift shaft. The building dates from 1975, and its foundations were designed to support the extra storey, Westland explains. “We didn’t need to do anything to the existing foundations, apart from adding a separate foundation for the lift pit. Using lighter timber elements makes a huge difference to the weight.”

Mostly scaffold-free

Building on a ‘postage stamp’ site in Amsterdam calls for tight planning and a detailed transport schedule. The municipality of Amsterdam issued a temporary permit to use three parking spaces in front of the building. All the prefabricated elements had to be delivered and hoisted onto the roof within four weeks. “Residents were not allowed onto their balconies during the lifting operations, however hot it was. We don’t want to create an unsafe situation. We also built largely without scaffolding. We made the connection between the old and new sections from a cherry picker. Everything has gone well so far, although we have had some problems with leaks. This was particularly inconvenient for the residents, but we were able to resolve most of it with pumps and the building is now watertight. This project is a challenging puzzle because we have to take a lot of things into account, such as logistics and safety. But so far, everything is going well.” 

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectModular construction
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.