Modular construction

Completely new building services for former Rijksmuntgebouw

Text Ramona KezerImage Lilian Fotografie/Putman

Alle werktuigbouwkundige installaties die je kunt bedenken, komen erin.
Alle werktuigbouwkundige installaties die je kunt bedenken, komen erin.

‘We reviewed the entire system thoroughly to see where we could make savings’

Building services company Putman is installing new heating, cooling, ventilation, plumbing and control systems at the former Rijksmuntgebouw, ‘De Munt’, in Utrecht.

The listed building is being repurposed. Its exterior will remain largely intact, while the interior is undergoing major refurbishment: it will house conference rooms, offices, a sports facility and catering facilities. 

The building services company employs around sixty people and works for a range of clients, from private individuals on small projects to clients on large-scale projects. Project manager Henk Zwaan is responsible at Putman mainly for non-residential projects, covering both new build and renovation. “The former Rijksmuntgebouw is becoming a multi-purpose building with a very wide range of functions. We were brought on board by main contractor Jurriëns Bouw, with whom we have worked for years, often in construction team arrangements.”

The entire system was thoroughly reviewed to save as much energy and water as possible.

Complete system, including controls

Putman is fitting the listed building with entirely new heating, cooling, plumbing and ventilation systems, as well as control technology, including a building management system. “It will contain virtually every type of building services installation you can think of. The listed section will mainly have ventilation convectors, while the offices and restaurant will have underfloor heating and cooling. The sports area will have a separate air handling unit on the roof, connected to district heating and a separate cooling system. We are developing the building management system in-house.”

High energy performance system

The building services contractor is now well over halfway through the project. Work began in the basement in April 2024, where the energy generation equipment will be located: the district heating and cooling system distribution units, as well as the chiller itself. The main heating and cooling pipework runs beneath the entire building, with pipes rising from it into each building section. The air handling units with heat recovery are located throughout the basement, on the roof and in other plant rooms. “This is how we are creating a high energy performance ventilation system. The large, high-efficiency chiller has a cooling capacity of 480 kW and uses a special refrigerant to keep its GWP value (<1) as low as possible. This makes the installation highly environmentally friendly.”

Insufficient power capacity for now

Every room in the building will have a CO2 control system. Air quality will be measured according to occupancy, and ventilation adjusted accordingly. In short, the more people in the building, the harder the ventilation system has to work.

“What makes this project challenging is that we will have insufficient power capacity for the entire building until at least 2028. That is why we reviewed the whole system thoroughly to see where we could make further savings.” Water-saving measures have also been implemented in line with BREEAM, so that no water is wasted. Zwaan is pleased with how the project has progressed so far. “We monitor progress through weekly meetings. The client is involved too, as they have to make the decisions on the finishing touches, such as where the grilles should go and where it would be practical to put the thermostat. Tenants also make requests along the way, and we accommodate as many as possible.”  

Question about this story? Ask your question

Who worked on Rijksmuntgebouw

  1. main contractorJurriënsMentioned in Glass as a specialism
  2. heritage glazingDe Glazen SwaanMentioned in Glass as a specialism
  3. main contractorJurriëns Midden BVMentioned in Conversion and restoration of former Rijksmuntgebouw in Utrecht
  4. certificateKIWAMentioned in Painting and timber decay repairs at Muntgebouw
  5. painting and wood rot repairCoen Hagedoorn BouwgroepMentioned in Painting and timber decay repairs at Muntgebouw
  6. main contractorJurriëns BouwMentioned in Painting and timber decay repairs at Muntgebouw
  7. paint manufacturerWijzonolMentioned in Painting and timber decay repairs at Muntgebouw
  8. building services contractorPutmanIn this story
  9. ventilation and installation companySoprowa ElsakerMentioned in Ventilation system for former Rijksmuntgebouw

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectRijksmuntgebouw
  • SubjectModular construction
  • CompanyPutman
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.