Concrete construction at The Ox in Amsterdam Nieuw-West
Text Elodie KintImage De Kock Betonbouw

‘A true partner in the structural phase’
Careful preparation, a solutions-oriented approach and smooth walls. These are just some of the things Nick Dijkhof, work planner at Van Wijnen, appreciated about working with De Kock Betonbouw during the structural phase of The Ox. “The concrete contractor promised not only to be a partner on this project, but genuinely was one.” He looks back on the project with Martin de Kock, work planner and estimator at De Kock Betonbouw.

Dijkhof: “The Ox is an apartment building in Amsterdam Nieuw-West with 168 residential units across nine storeys, with a car park underneath. We are building it for Vesteda Investment Management.”
De Kock: “De Kock Betonbouw delivered the complete structural shell for this project, from the foundations to the roof, and from advice through to construction.”
Dijkhof: “We have a fair amount of expertise at Van Wijnen, but in principle we are generalists. Working with you, as a specialist in structural construction, allowed us to go into greater depth.”
De Kock: “We worked together to find the best approach and opted for a combination of wide-slab floors, in-situ concrete and prefabricated components. We used our own steel wall formwork to cast both the internal walls and the basement walls.”
Dijkhof: “That worked out very well. Normally, the plasterer has a long list of points to address, but there were hardly any here. The cast concrete walls were of very high quality.”

Building without scaffolding
Dijkhof: “You also gave careful thought to the programme from the outset. We initially asked to work to a ten-day cycle for each storey, but you immediately said that wouldn’t be achievable.”
De Kock: “That’s right. We like to keep the programme as realistic as possible, to prevent speed from compromising quality, safety and, ultimately, the budget. It is always cheaper to get the work right first time.”

Dijkhof: “So we opted for fourteen days per storey, and you met that programme almost every time. By the end, you needed just one extra week to catch up on a little work. That’s negligible on a project of this scale.”
De Kock: “Especially considering we had to cast a total of 5,300 anchors to attach the timber-frame façade panels and balconies later on. That had to be done very precisely.”
Dijkhof: “You did a really precise job: we only had to adjust 2 or 3 of them.”
De Kock: “Another unusual aspect of our approach was that we built entirely without scaffolding. We used our own wide-slab floor supports to install perimeter tables on the open bays and end-wall scaffolds on the gable end. With a C-hook with an arm reach of around 5 metres, we could move them up
one storey at a time. This saved a lot of labour hours and meant the façade system could be installed right behind us.”

A partner on the job
Dijkhof: “A number of unforeseen problems also arose during the project. That’s part and parcel of the work, but what makes the difference is how you deal with them. You always worked with us to find solutions and explore the options. The roof floor wasn’t completely level, but you put that right neatly. And the whole industry faced substantial price rises as a result of the coronavirus crisis and the war in Ukraine.”
De Kock: “We had, so to speak, budgeted for concrete at 100 euros per cubic metre, and suddenly it was 140 euros per cubic metre. But I felt that was a business risk we had to bear.”
Dijkhof: “At first, you absorbed a great deal of those extra costs. Only when they became excessive did we sit down together to see what we could do. We really appreciated the way you handled it.”
De Kock: “That’s what De Kock Betonbouw stands for. We want to be a partner on the job and take responsibility. So you won’t get an invoice from us for every little bit of extra work.”
Dijkhof: “A lot of subcontractors make that claim, but don’t live up to it. You really did behave that way: always looking for a solution and working together. That’s quite unique.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectModular construction