Residential and non-residential construction

An energy-neutral sports building with stacked sports halls

Text Liliane VerwooldePhotography VenhoevenCS

In het Sportgebouw zijn alle sportfaciliteiten in gestapelde ‘sportboxen’ georganiseerd. Tevens is het de entree van Universiteitscampus Woudestein.
In het Sportgebouw zijn alle sportfaciliteiten in gestapelde ‘sportboxen’ georganiseerd. Tevens is het de entree van Universiteitscampus Woudestein.

Featuring materials harvested for reuse

The new Sports Building at Erasmus University Rotterdam is a training and competition facility for more than 50 sports. Yet it is easy to find your way around the building. All the sports halls are visible from the central core, a bright, lofty indoor street with stairs, walkways, greenery and hospitality facilities. From the moment they arrive, visitors are encouraged to get moving too.

The design was created by Amsterdam-based architects VenhoevenCS. They arranged the sports halls in two volumes, slightly offset from one another and linked by the indoor street. The practice was awarded the contract because it met all of Erasmus University Rotterdam’s requirements. “It was a Design & Build tender,” says Manfred Wansink, architect and managing partner at VenhoevenCS. “The building had to be deliverable at a good price. Its appearance and architecture had to complement the other buildings on campus, it had to be energy-neutral, and construction was also the responsibility of the D&B team.”

The stairs and walkways connect the sports halls and bring students together.

Talking and gaining insight

To gain insight into the thinking behind the brief, VenhoevenCS spoke with the future users of the Sports Building. Remmers Sport & Onderwijs, the contractor and main contractor for the project, was involved in these discussions from the outset. “The integrated approach worked extremely well, and the discussions were illuminating,” says Wansink. “It became clear how we could meet the requirements of the brief in practice and even accommodate additional wishes. Sustainability and circularity proved to be really important themes.”

Sustainable and circular

Having scored highly in the tender for its approach to the building’s appearance, VenhoevenCS clad the indoor street in greenery, connecting it with the surrounding area. “We created an outdoor feel in the indoor street,” says Martijn Tjassens Keiser, architect at VenhoevenCS. In keeping with the principles of sustainability and circularity, the interior façade was clad with 1,200 m2 of FSC-certified timber from Het Paviljoen in Eindhoven. A total of 500 m2 of metal ceiling panels was salvaged from a youth institution in Zeist. Tjassens Keiser says: “This was a challenging task. We had to decide whether the timber was suitable for an area of 1,200 m2 based on just a few boards. They had been stripped of nails, but still had paint residue and drill holes. As a used product, no two boards were alike, but that was part of their charm. They also bring added acoustic value.” With systems that use geothermal, water and solar energy, they made the building energy-neutral. 

The bright, lofty indoor street is defined by stairs and walkways.

An impressive entrance building

Wherever NOC*NSF standards allowed, transparency was prioritised. The result is a Sports Building with all sports facilities arranged in stacked ‘sports boxes’, which also serves as the entrance to Universiteitscampus Woudestein. “Given the building’s prominent and attractive location, we wanted to preserve a sense of openness. That is why the indoor street and fitness areas are marked by tall, bright atriums. The striking lighting ensures the building catches the eye in the evening too.”  

A business enquiry for Hoppenbrouwers Techniek BV? Get in touch

Who worked on it

  1. ClientErasmus Universiteit Rotterdam
  2. ArchitectVenhoevenCS architecture + urbanism, Amsterdam
  3. Structural engineerIngenieursbureau Verhoeven-Leenders B.V., Volkel
  4. ContractorRemmers Sport & Onderwijs, Tilburg
  5. Building services installerHoppenbrouwers Techniek, Udenhout
  6. Construction periodMarch 2021: September 2022

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectResidential and non-residential construction
  • CompanyHoppenbrouwers Techniek BV
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.