Residential and non-residential construction

Climate control at H-Park Hilversum

Climate control at H-Park Hilversum

An important part of the renovation of H-Park is the renewal and improved insulation of the building envelope, and the installation of environmentally friendly systems. Together, these measures make H-Park gas-free, energy-efficient and ready for the future.

BLR Bimon Klimaatbeheersing is responsible for all the building services installation work at H-Park. The company carries out the initial survey, complete design and engineering, coordinates with the other parties, and plans the risers and ducts. “We have worked with the client before,” says Wim Birkhoff, director and owner of BLR Bimon. “That certainly helped us secure the contract. But we also earned it. Thanks to our expert advice, H-Park is ready for the future again.”

BLR Bimon

Revised advice
Birkhoff is referring to the advice drawn up earlier on how to heat H-Park. This proposed an ATES system to heat the building, supplemented by a gas-fired central heating system to provide the large quantity of domestic hot water required. “For a building that needs to last another 25 years after renovation, that is not a good decision,” says Birkhoff. “So we submitted revised advice, providing heating, comfort cooling and hot water using heat pumps. This is a better decision both for the environment and for the property owner.”

Underfloor heating and air-source heat pumps
The revised advice led to a package of energy-saving measures, including a new building envelope and effective insulation. Underfloor heating is also being installed in every room to maintain a constant baseline temperature throughout the building. This method of heating saves the owner a great deal of energy. An air-source heat pump in each room makes it possible to fine-tune the temperature, allowing users to cool or heat the space as required. 

BLR Bimon

Room to progress
“BLR Bimon Klimaatbeheersing manages everything in-house,” says Birkhoff. “We can deliver a project of this size entirely with our own people. We have 120 skilled staff, including 85 installers. We also have our own training school, which helps us keep our knowledge up to date and grow the team responsibly. Staff can progress into the roles they aspire to, such as lead installer or service engineer.”

Storing energy
“Heat pumps have proved their worth,” says Davey Heeren, project manager at BLR Bimon, who is responsible for delivering the climate control plan. “Heat pumps can heat a well-insulated building very effectively. The part of the building combining residential and work spaces needs a lot of domestic hot water, with more than 60 bathrooms. We generate the energy required with three heat pumps, each rated at just 30 kW. To ensure there is enough hot water during peak periods, three buffer tanks of 2,000 litres each have been provided. Heeren is very positive about the collaboration and how the project is progressing. “All the partners honour their commitments, allowing everyone to keep work moving along smoothly. Following the installation of the internal systems, air ducts and pipework, we started installing the heat pumps and air handling units on the roof in mid-April. These will be tested and commissioned before handover.”

A business enquiry for BLR-Bimon Klimaatbeheersing? Get in touch

Wie aan H-Park werkte

  1. installation workBLR Bimon KlimaatbeheersingIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectH-Park
  • SubjectResidential and non-residential construction
  • CompanyBLR-Bimon Klimaatbeheersing
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.