Residential and non-residential construction
Electrical installations tailored to the project
Text Jan-Kees VerschuurePhotography Ernst van Raaphorst

The main electrical installations at Het Dok are being carried out by E.T.B. Cas Sombroek. The Volendam-based electrical engineering and ICT specialist installed all systems within the prefabricated construction system, with the exception of the access control systems. In two of the three towers, it was supported by a subcontractor providing additional staff. “Taking account of the scale of the project and the COVID-19 measures, we completed it through good collaboration and organisation,” says project manager Jaap Tol.
The work on the electrical installations for a high-rise complex with a basement, a 150-metre-long podium and 449 apartments, was challenging in terms of timing. Tol: “It is still concrete construction, so everything had to be installed by hand, apart from the ceiling junction boxes and the lightning protection system, which were included in the prefabrication process; ed. Logistically and in terms of planning, the work was well coordinated with the main contractor and the other installers.” A loading platform was installed to bring personnel and materials to the site, allowing the prefabricated high-rise section to be built almost without scaffolding. “The site lighting had also been arranged before installation began.”
Installation floors
With the restrictions in place, fewer people could use the construction hoist, which meant additional staff were needed during the construction phase (2020-2022) whenever possible. E.T.B. Cas Sombroek assigned its five employees to two of the three high-rise towers, with support from a fellow installer working as a subcontractor. “Apart from a few commissioning points, we handed over the work in April this year.” The electrical installer carried out all standard installations, with the exception of the access control systems, including lighting, intercom, PV and CCTV systems, in the car park basement, the commercial podium and the residential towers. “The apartment ceiling junction boxes were cast into the prefabricated concrete Bestcon floors, which also incorporate the main services. Our work fitted well with the process,” Tol concludes.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectResidential and non-residential construction