Residential and non-residential construction

Terras aan de Maas Tower II, Spijkenisse

Terras aan de Maas Tower II, Spijkenisse

Ten years ago, a luxury 100-metre-high residential tower was built in Spijkenisse: Terras aan de Maas I. Construction of a second, similar tower was postponed due to the economic crisis. Work on Terras aan de Maas II eventually began in 2018. The shell is now almost complete. The project is being developed by VOF Dijkzone and built by VORM.

‘Not an exact copy’

Both towers stand on the banks of the Oude Maas and are striking landmarks, with their irregular shapes, large balconies and attractive façade finishes, including natural stone. Harold Clabbers, senior project developer at VORM, says the towers have a similar appearance and are also being built in almost exactly the same way. “But they are not exact copies; there are differences in the details. In any case, Tower B, at 70 metres, is lower than Tower A, which is 100 metres tall. What’s more, ten years have passed. Certain aspects have been adapted to current regulations, although the plans were already very forward-looking in 2010 and we have not had to change much.”

10698_ext_06-kopieren

At 70 metres, Tower B is lower than Tower A, which is 100 metres tall.

While Tower A, completed in 2013, includes commercial space, Tower B consists entirely of apartments. These are available to buy or rent, in the social, mid-market and, in part, upper segments. “That is in line with the agreement with the housing association, which is now only permitted to focus on social housing. This allows us to meet some of the demand for social rented housing. We conducted market research into this.” Clabbers explains that, as with Tower A, Stichting Humanitas can also provide tailored home care for residents of Tower B. “The homes are therefore also very suitable for people with care needs who are still able to live independently.”

Excellence Areas

Because the full permitting process had already been completed during preparations for the construction of Tower A, less time needed to be spent on it this time. Clabbers says: “As I mentioned, we reviewed current building requirements and made certain adjustments accordingly. This was especially relevant because, when the overall development of Towers A and B was planned, the project was designated an Excellence Area, one of a number of showcase areas with a strong focus on energy-efficient new-build. The new tower will also have a heat recovery ventilation system, among other things. In addition, Tower B will be connected to the communal thermal energy storage system that has already been built.” He says there is regular consultation with the owners’ association (VvE) on comfort in the homes. It is already active for Tower A. “In future, both towers will fall under a single umbrella owners’ association.”

Both towers stand on the banks of the Oude Maas.

Just in time

Construction of Tower B is now in full swing. The shell is almost complete, with the final tunnel section having been cast, and fit-out work has begun. Pointing to differences in the construction method, Clabbers cites the different ground conditions at Tower B as an example. He adds that space on the site is limited, so deliveries are generally made just in time. “In terms of logistics, we of course have to take the safety of the surrounding area into account. This was carefully considered when the delivery routes were established.” Another challenge is the effect of the wind, particularly on the tower cranes. “As a result, we lost several days to high winds. The coronavirus is also a factor. It is difficult to find enough staff at the moment.”

Nevertheless, construction is progressing more or less to schedule, says Clabbers. “We expect to complete the first phase by the end of the year and to finish the project definitively in the course of the first quarter of 2021.”    

Question about this story? Ask your question

Who worked on it

Terras aan de Maas II in Nissewaard

  1. designedDam & Partners Architecten
  2. developmentVOF Dijkzone

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectTerras aan de Maas II
  • SubjectResidential and non-residential construction
  • CompanyVOF Dijkzone
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.