Residential and non-residential construction
Waterfront, Dalfsen | Distinctive in character, rich in diversity

Commissioned by Ontwikkelingscombinatie Waterfront Dalfsen (OCW), comprising Loostad bv and VolkerWessels Vastgoed bv, Koenen Bouw from…
Waterfront lies between the village centre of Dalfsen and the Overijsselse Vecht. Recently completed, the project is an urban development on the site formerly occupied by the old town hall and a printing works. Between 2013 and 2020, 85 houses and flats, an Albert Heijn supermarket, two restaurants, a theatre, various shops and a car park were built here. Koenen Bouw from Emmen was responsible for delivering the project on behalf of Ontwikkelingscombinatie Waterfront Dalfsen (OCW), comprising Loostad bv and VolkerWessels Vastgoed bv.
Built in five phases, Waterfront is characterised by its distinctive, classical appearance and individual character. In keeping with the village and its natural surroundings, the modern homes do not look like new builds from the outside. The wide variety of façades gives the streetscape its character. At the same time, the Vecht has been successfully integrated into the area, perfectly aligning with the objective set by the municipality of Dalfsen.
“Dalfsen used to turn its back on the Vecht,” says development manager Dennis Damink, speaking on behalf of OCW. “That had to change, and we succeeded. With the completion of Waterfront, we have given Dalfsen an attractive and representative face on the river. A face with distinctive architecture and plenty of variety. Every building, large or small, has its own look and character. Alongside the splendid location, that is what makes the project special.”

Art Nouveau façades.
A winning combination
OCW secured the commission after winning a competition launched by the municipality of Dalfsen in 2008. “The competition called for a masterplan and a bid for the land,” Damink continues. “The best combination of the two would win. During the assessment process, the people of Dalfsen were given a significant say in shaping the most appropriate proposal. We ultimately won, and the agreement was signed at the end of 2009. At that point, the local plan still had to be drawn up. One of the requirements was to avoid obstructing the wind supply to a nearby listed windmill. We succeeded in that too.”
A nod to the past
Koenen Bouw from Emmen carried out the phased construction of Waterfront. Managing director Piet Wigboldus looks back on the project on behalf of the VolkerWessels subsidiary: “When the competition was held, the world was in the grip of the financial crisis. It therefore took a while before we could get started.” The local housing association VechtHorst’s decision to participate in the project with a number of rented flats, together with Albert Heijn’s willingness to invest, meant that work could get under way in mid-2013. Now that the project is complete, Wigboldus also praises its varied character. “As well as shops, you’ll find owner-occupied houses, owner-occupied flats, social housing and private-sector rental homes. But above all, Waterfront stands out for its architecture, which looks back to the past, particularly in its façades. It was a great challenge for us to recreate the craftsmanship of historic façades cost-effectively. Together with the skilled teams from our construction partners, we did an excellent job.”
The construction of a theatre and adjoining grand café also presented a challenge. The original plan was to house both functions in a chicory factory that was to be renovated, but a lack of space and the poor condition of the façade ultimately led to the decision to abandon this plan. “Instead, we demolished the old factory and rebuilt it in its original style,” Wigboldus concludes.
Question about this story? Ask your question
Keep following this
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectWaterfront
- SubjectResidential and non-residential construction