100% recycling of used tar-bound asphalt

A new thermal treatment plant is currently being built in Vondelingenplaat, in the Port of Rotterdam. At this plant, old tar-bound asphalt, mainly sourced from roads in the Netherlands and neighbouring countries, is fully converted into primary raw materials, electricity and heat. The process is unique in the world.
Thermal treatment process produces clean sand, gravel and filler
The turbine building at the thermal treatment plant in Rotterdam consists of two volumes: a high-rise section and a low-rise section. The control room will be fitted out in the low-rise section, with computers to control the treatment process and the turbine. Seven transformers will also be installed here. A steam turbine and a large generator will be installed in the high-rise section.
Thermal treatment
The asphalt is recycled in a rotating rotary kiln at a temperature of around 1,000°C. This high temperature completely incinerates all the harmful substances in the asphalt. The thermal treatment process produces clean sand, gravel and filler, ready for reuse. Energy from the hot gases is recovered as steam and converted into electricity by a steam turbine. Thanks to this innovative approach, around 210,000 megawatt hours of electricity are generated each year. This is enough to supply around 50,000 households with electricity.

Phase 2 is in full swing.
Collaboration between clients and contractors
Middelwateringbouw is working on both the low-rise and high-rise sections. The low-rise section comprises transformer rooms, a control room and office facilities. The high-rise section houses the turbine room. The turbine requires a heavy concrete foundation, built by GMB Haven & Industrie. Its outer shell consists of a steel frame clad with sandwich panels and brickwork. “It feels good to take on the construction work as a construction team,” says John van Rees, project manager at Middelwateringbouw. “This is a very complex project, using the latest technology. We are working with our client, GMB Haven & Industrie, on the building work. A defining feature of this project is that clients and contractors are joining forces to develop the best solutions.”
Constrained site
Alongside the innovative challenges, Middelwateringbouw faces more conventional ones too. The turbine building is being constructed on a constrained site, where it is not the only contractor at work. Middelwateringbouw is building one section, while the entire plant comprises several sections being built by different contractors. Cranes, lorries and no fewer than 150 skilled workers move around the site every day to carry out their work. This calls for careful logistical planning. “Everything has to be delivered just in time,” says Van Rees. “We are also working in different phases. The final phase of the control room and office facilities is now at the finishing stage.” The client is handling the fit-out of the turbine building.
Question about this story? Ask your question
Wie aan Thermische reinigingsinstallatie Rotterdam werkte
- construction teamMiddelwateringbouwIn this story
- clientGMB Haven & IndustrieIn this story
Keep following this
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectRotterdam thermal treatment plant
- SubjectGeneral
- CompanyMiddelwateringbouw
- CompanyGMB Haven & Industrie