
‘The challenge lies in the scale and size of the project’
ETB Cas Sombroek is carrying out the electrical installations and fire alarm and evacuation system, including the data network, for Van Mossel.

‘The entire building must be completed in nine months’

Curtain wall with panes measuring no less than 5.5 metres

Infrastructure with on-site water storage

A steel structure delivered at the fastest possible pace
Advertisement

Internal logistics the biggest challenge for fit-out contractor

Through wind and weather: building Hotel Bloemendaal aan Zee

Complete façade maintenance for homes at Elzendreef
Advertisement

Built to withstand the salty sea air in Noordwijk aan Zee

Four colossal glulam beams
Advertisement

Electrically operated windows: ‘This calls for collaboration between the installer and the window supplier’

Quiet systems for schools: the quietest attenuators in the Netherlands

Superkist, fast, innovative foundation formwork
Product information
‘Companies need to select more for people who complement one another’

Withstanding severe storms and torrential downpours with ease
Product information
Steelwork with challenges W. ten Ham Constructie bv Steelwork with challenges

Project flooring: The right floor for every space

Adapting flexibly to circumstances
Advertisement

Façade profiles give Dulon College in Ede a new look

Carrying out checks and coming up with creative solutions

NO ROOF TO WASTE

Sustainable aluminium for the window frames of DUI01

Integrated delivery gets densification in Alexander under way

Prefab concrete frame system enables predictable construction
Advertisement
The best of Stedenbouw in your inbox every two weeks.
- Projects, products, solutions and partners
- The most interesting industry developments
- Free and without further obligation
Sign up for free
In your inbox every fortnight.










