Complete wall, ceiling and façade systems
Text Ramona KezerImage Knauf, Kristel van Dijk

Fire, moisture and sound resistance
At the new-build offices for Nh1816 Verzekeringen in Oudkarspel, several Knauf systems were used. The company’s different divisions worked together to achieve a good result. “It’s great to be able to contribute to a project like this as a supplier of complete systems.”

Using Knauf’s systems offers a major advantage. The supplier provides a performance guarantee for the complete system, from wallboard to finish coat. This gives both the contractor and the interior finishing contractor confidence that the required performance will be achieved.
Different types of plasterboard
Knauf was initially approached to provide samples of Aquapanel for the building’s external ceilings, says Timothy Blauw, commercial technical adviser for drylining systems. “The enquiry came to us via De Mossel Projectafbouw, a contractor we often work with. They have extensive experience with our systems and always use our products. In the end, 18,000 m2 of Knauf A-Board, 13,000 m2 of Diamond Board and 7,200 m2 of Knauf Horizonboard were installed.”

Each board has its own distinctive properties, Blauw explains. Knauf A-Board is the standard plasterboard. “Horizonboard is also a plasterboard, but it has tapered edges on all four sides, allowing for a better finish. Diamond Board is an all-rounder: it is fire-resistant, absorbs moisture more slowly, has increased breaking strength and is impact-resistant. It can also be used as a finish board.” The choice depends on the sound and fire resistance requirements in the specification, he says. “We can demonstrate that our products meet those requirements. The products are then supplied through a builders’ merchant, in this case via Pontmeyer, BMN Van Keulen and Omtzigt.”
External façades and ceilings
Main contractor De Geus Bouw then requested samples for the brick façades and the external ceilings beneath the overhangs. Marije Tibbe and Tim de Boer were brought into the project at this stage. Tibbe is a project adviser for façades and Aquapanel, and was asked to review the external ceiling and part of the façade. “A timber-frame system with Aquapanel Skylite was chosen. This lighter version is suitable for indoor and outdoor ceilings, and was finished with a Knauf render system. This lightweight cement-bonded board is moisture- and mould-resistant and meets fire class A1. The boards are 8 mm thick. For façades, we always recommend 12.5 mm Aquapanel Outdoor. Around 1,600 m2 of ceiling boards and 200 m2 of façade boards were used for the exterior of this building.”

A consistent appearance through the use of one brand
De Boer, a commercial technical adviser, advised on the render systems to be used. “Because complete Knauf systems are being used, for both the boards and the finishes, we can provide the Knauf Zeker performance guarantee for the entire package. As Knauf external façade render products are used all around the building, it has a consistent appearance throughout.”
Veerman en Kemper Afbouw applied the render to both the Aquapanel boards and the brickwork. De Boer says: “They know our products and applied around 2,200 m2 of render to the brickwork and the Aquapanel boards here. We prepared advisory reports in advance so we could give the client sound advice on the right application.”

Knauf is closely involved in projects like this. Although the manufacturer does not supply contractors directly, they can still count on advice and support. Tibbe says: “Tim and I also visited the site a few times. Initially, we went through the details with the contractor, and later we returned while the boards were being installed or rendered.”
‘Combining products effectively’
This is certainly not the first time that Knauf’s divisions have worked together on a project. Tibbe says: “It happens fairly often, but we’d be happy to see it happen much more often. This was also a fantastic project, with an eye-catching design by a well-known architect. We were able to combine all our products effectively.” All three were very positive about the pleasant collaboration with the contractor, subcontractors and builders’ merchant. De Boer says: “De Geus Bouw was not new to us. They handled everything well and followed our advice. That makes for a good working relationship.”
A business enquiry for Knauf? Get in touch
Who worked on Kantoorpand Nh1816 Verzekeringen
- Mechanical installation
Wesselingh InstallatiesMentioned in Water services, drainage, gas connection, sanitaryware and ductwork - main contractorDe Geus BouwMentioned in Water services, drainage, gas connection, sanitaryware and ductwork
- clientNh1816 VerzekeringenMentioned in Water services, drainage, gas connection, sanitaryware and ductwork
- electrical installationElektropartnersMentioned in Distinctive office building for insurance company
- finishing contractorDe Mossel ProjectafbouwIn this story
- plasterworkVeerman en Kemper AfbouwIn this story
- building materials supplierPontmeyerIn this story
- building materials supplierBMN Van KeulenIn this story
- building materials supplierOmtzigtIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectNh1816 Verzekeringen office building
- SubjectGeneral
- CompanyKnauf
- CompanyDe Mossel Projectafbouw
- CompanyVeerman en Kemper Afbouw
- CompanyPontmeyer
- CompanyBMN Van Keulen