When you start work in historic buildings, you can be in for a few surprises. Anyone working in historic building renovation knows that. But no one could have imagined that surprises would turn the installation work at the Royal Netherlands Academy of Arts and Sciences, estimated to take around eight months, into a fifteen-month project.

‘This project called for creative solutions’

Kloveniersburgwal 25 is part of the historic KNAW building in Amsterdam and forms part of Het Trippenhuis. Between 2017 and 2019, the building, together with the properties at numbers 27 and 29, underwent extensive renovation. SDR Elektrotechniek was tasked with installing new systems on the ground floor and in the new extension at number 25, where the KNAW’s new kitchen and restaurant were planned. In the existing section, the company checked whether all the electrical systems still met current standards.

17th-century listed building

Kloveniersburgwal 25 had everything you would expect of a 17th-century building: linen ceilings, marble floors, lath work. It was all there. “That made our work in the old section more complex than expected,” says Peter van Driel, project manager at SDR. “To equip the building with modern systems, we had to submit a number of alterations to the heritage authorities for approval.”

20180615_085449-kopieren

Overhead view of the new extension in the garden.

Kitchen fit-out

The new professional restaurant needed new kitchen equipment. Van Driel says: “The lack of space called for creative solutions. For example, we installed several electrical systems and catering facilities, such as refrigerators and freezers, in the basement.”

A greater challenge emerged when it became clear that the building did not have sufficient capacity for the modern facilities required. That would not normally be a problem, except that the nearest transformer able to provide the required capacity was at number 31. “That was four buildings away!”, Van Driel stresses. “And when we looked into the options, it turned out that part of the neighbourhood was connected to the KNAW’s supply. This created a considerable challenge.”

An unexpected solution

“There were several difficult discussions,” Van Driel admits. “The neighbours would rather not switch over. The energy supplier was willing to install a new transformer on the canal, but couldn’t find a suitable location. In the end, we were offered the required capacity from number 31, but the owner of number 27, the Central Government Real Estate Agency, did not want supply cables running through its building. To get around this, we installed a busbar trunking system, connecting numbers 25 and 29 via the basement. This caused delays, however, creating tension between the parties working together and pushing the budget over. By continuing to focus on finding solutions, we eventually got the project over the line.”

In totaal omvat het DC in Roosendaal 15.852 m2 aan vloeroppervlakte.

Kloveniersburgwal 31 was able to provide the required capacity.

Systems in the new section

Installing the systems themselves went much more smoothly. These ranged from power systems, lighting and security to fire alarm and audiovisual systems. This part of the work went without a hitch.

“You know to expect surprises in historic buildings,” Van Driel recalls. “Usually, we relish the challenge; it’s our speciality. But here, Murphy’s Law was in full force. One unforeseen issue followed another. I’m proud of our team. This exceptional project challenged us on every front. We learned from it and, more importantly, delivered the project to everyone’s full satisfaction.”   

A business enquiry for SDR Elektrotechniek B.V.? Get in touch

Companies in this story

Keep following this

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

What you follow
  • ProjectKoninklijke Nederlandse Akademie voor Wetenschappen
  • SubjectHeritage construction
  • CompanySDR Elektrotechniek B.V.
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.