Yearbook

‘Integrated design means better design’

Text Lieke BousemaImage Stabiel Management

Voor project High Five op het Utrecht Science Park heeft Stabiel Management gezocht naar het juiste omslagpunt van bouwmethodes.
Voor project High Five op het Utrecht Science Park heeft Stabiel Management gezocht naar het juiste omslagpunt van bouwmethodes.

For smart, sustainable and cost-efficient design and construction, the best approach is to coordinate the building layout, load-bearing structure, façade treatment and building services at an early stage. This means working with the client, architect, lead structural engineer, (developer-)contractor and building services consultant. This is the case made by Silvester Snijders, who shares the management of Stabiel Management with Peter Duits.

Stabiel Management is a prefabrication specialist. “With decades of experience in prefabricated construction, we can guide (developer-)contractors, property developers and architects towards a viable structural shell from the early design stages (SO/VO),” Snijders stresses. “We have not only extensive structural expertise in-house, but also understand the impact of specific design choices on costs and construction speed. As a strategic advisory and delivery partner, we design the prefabricated structure to be built quickly, intelligently and at minimal cost. And we deliver on that promise through the detailed design and construction stages.”

Breaking with convention

“A commonly held assumption in construction is that clients or developers present their requirements, on the basis of which the architect designs the best and most attractive layouts,” says Snijders. “The lead structural engineer then translates the scheme into a structurally feasible and buildable design. However, by this stage the lead structural engineer is already bound by decisions made earlier. The same applies to the contractor and all the specialists who come to the table after them. I feel the industry is missing many opportunities here, especially in tendering. Of course, architects and lead structural engineers design with the very best intentions. But they do not always have a clear picture of the impact their choices may have on construction methods, costs and speed. Stabiel Management is keen to change this by considering multiple disciplines at an early stage.” This need not be an extensive process, he emphasises. “A few (scrum) sessions during the SO and VO stages can already provide better direction for the design. For example, a session on load paths and span directions, possible floor systems, and the design of load-bearing and non-load-bearing façades, with our façade partners involved where necessary.”

The NVM headquarters in Utrecht is an excellent example of integrated design.

Cost-effective structure

“Good coordination is essential for prefabricated construction,” says Snijders. “From the advisory and sketch design stages onwards, we work proactively with the key stakeholders to identify ways to make a building more cost-effective. For example, by keeping the structural shell as simple and slender as possible and separating the building services from the structure as much as possible.”

As Stabiel Management works with various production partners, it can deliver both 100% prefabricated concrete structural shells and innovative hybrid material combinations. “For example, prefabricated concrete combined with steel and/or timber. We consider not only buildability and affordability, but also sustainability. Each material has its pros and cons. Concrete structures, for example, offer excellent acoustic and fire resistance and are easy to finish, while a steel load-bearing line can sometimes be more cost-effective. However, steel structures require additional fire protection, which adds another trade operation. Timber is lighter, sustainable and renewable, but allows for shorter spans. These are the kinds of trade-offs we like to clarify at an early stage, so that the design and construction are right first time, intelligent and cost-efficient.”

Independent adviser

Because Stabiel Management does not manufacture its own products, clients and developers can be sure of receiving independent advice. “This means they do not have to commit to one manufacturer during the SO and VO stages, but can weigh up all the options and their pros and cons,” says Snijders. “With more than 80 specialist draftspeople, modellers, structural engineers and project managers, we can provide thorough advice on projects of all sizes.”

Silvester Snijders: “We have not only extensive structural expertise in-house, but also understand the impact of specific design choices on costs and construction speed.”

NVM headquarters

The NVM headquarters in Utrecht is an excellent example of integrated design. Stabiel Management delivered the prefabricated structural shell for the project on behalf of Heembouw. “We were involved as a strategic partner from the design stage in developing the prefabricated structure, which comprises precast concrete façade elements, internal walls and columns, integrated steel beams, and hollow-core slabs with a structural concrete topping,” says Snijders. “Working with us through several design iterations, the architect developed layouts with plenty of space and flexibility, as few load-bearing lines as possible, and a very slender yet complete prefabricated primary structure. We also coordinated the construction sequence and on-site activities with the other disciplines, enabling the building to be completed in record time.”

High Five

Another interesting project is High Five at Utrecht Science Park. It comprises 721 student studios and 200 student rooms across two residential towers, above a 6-metre-high plinth containing hospitality, sports and resident facilities. To achieve a fast handover, the upper structure is being built with precast concrete elements and steel beams, Snijders concludes. “The substructure, by contrast, is cast in situ. During the preparatory phase, we worked with the lead structural engineer to identify the right point at which to switch between construction methods. This creates scope for numerous optimisations, and we are keen to advise the project team on these.”

Have a business enquiry for Stabiel Management? Get in touch

Who worked on it

NVM headquarters Utrecht in Utrecht

  1. full-service installerLomans
  2. clientNVM
  3. prefabricated shellStabiel Management
  4. clientHeembouw

Keep following this

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

What you follow
  • ProjectNVM headquarters Utrecht
  • SubjectYearbook
  • CompanyStabiel Management
  • CompanyHeembouw
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.