Residential and non-residential construction

Circular apartments for students

Text Ramona KezerPhotography Daiwa House Modular Europe

Circular apartments for students

Building student accommodation at speed

Leerpark in Dordrecht is an innovative new urban district taking shape: a ‘Weconomy’ that encourages collaboration. It is a meeting place for people, cooperatives, education and small communities. It offers a wide range of educational programmes, from secondary schools and vocational training to higher professional education. Daiwa House Modular Europe is building student apartments here in collaboration with the municipality of Dordrecht.

The modules can be reused for other purposes.

“We are building 285 studio apartments and 48 two-bedroom apartments across two buildings,” says project manager Kris Kok of Daiwa House Modular Europe. “The studios will measure six by three metres, while the two-bedroom apartments are twice that size. A small proportion are intended for people in urgent need of housing or those who will receive supported accommodation. In any case, they are all intended for temporary occupation.” All the apartments have their own kitchen, bathroom and internet connection. They are therefore fully equipped homes.

The modules were completed in the factory in Montfoort.

Fast modular construction

With the housing shortage also acute in Dordrecht, the municipality wanted the homes completed as quickly as possible, preferably within the year. Daiwa House Modular Europe is building the apartments using a modular approach. Piling began in week 28 and the modules were installed from week 35. Kok says the industrialised production of the modules had started well before then. “We fully completed the modules in our own factory in Montfoort before construction began. We produce seven modules a day, or 35 a week. We then wrap them to make them wind- and watertight until delivery. On site, they can be stacked directly on top of one another and connected. The timber external cladding is fitted on site.”

As the contractor had already been building for some time, material shortages had limited impact. Kok says: “We had already bought a great deal of material before the war in Ukraine began. But price rises and material shortages have now become standard in the construction industry. We benefit from buying large quantities at once, although this can also mean careful planning for the procurement department.”

The two buildings will contain 285 studio apartments and 48 two-bedroom apartments.

Circular construction

As well as shortening construction time, modular construction also offers sustainability benefits. If the buildings are no longer needed in fifteen years’ time, 90% of the modules can be reused. Kok says: “The three-by-six-metre structural grid is a standard, fully engineered product for us. That means it meets residents’ needs now and can be put to good use in the future. The homes are also gas-free and heated by electric radiators. In addition, they are very well insulated and ventilated.”

Several parties also joined the project through the MIA/Vamil tax incentive scheme. The scheme encourages the creation of a circular materials chain by supporting the construction of circular buildings for residential use. “Sustainability is reflected in every aspect. For example, solar panels will be installed on the roof, and the benefit of net metering will go to the students, giving them lower energy bills. The MIA/Vamil scheme has also encouraged us to use new, sustainable products and materials. One challenge is the requirement for products and materials to have a Life Cycle Assessment (LCA) recorded in the National Environmental Database. This provides insight into their actual sustainability and circularity.”  

Leerpark is an innovative new urban district taking shape.

Question about this story? Ask your question

Who worked on it

  1. ClientGemeente Dordrecht in samenwerking met Leerpark 2F
  2. ArchitectRoos Ros
  3. Main contractorDaiwa House Modular Europe
  4. SubcontractorsKleywegen, Eskra Bouw, Mview+

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectResidential and non-residential construction
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.