DC Fazantweg, Moerdijk | Building on trust

Ten months. In that time, Bouwcombinatie Hercuton/Remco Ruimtebouw, part of the Business Accommodation Cluster of Janssen de Jong Groep, is delivering a new distribution centre on Fazantweg in Moerdijk. Trust is the foundation of this high-quality project for client Accres Real Estate, and the collaboration is constructive.
Accres Real Estate is a property company with a diverse portfolio comprising homes, shops, offices and commercial premises. “Optimising our existing property portfolio is one of our priorities,” says Jeroen Jongkind, Property Manager at Accres Real Estate. “With DC Fazantweg, we are replacing an outdated distribution centre in our portfolio. The building has been demolished, and construction of the new distribution centre is well under way.” Further along Graanweg, Accres Real Estate has another distribution centre, which is also due to be demolished. Construction of its replacement is scheduled to start in September this year.

Silver and copper-coloured bands on the office façades.
Functional and attractive
Jongkind continues: “We brought in DENC to design DC Fazantweg. The architecture practice has extensive knowledge and experience of logistics centres. It created a functional yet attractive building, finished in anthracite with silver and copper-coloured bands on the office façades.” Lucas van der Meij, development planner at the Business Accommodation Cluster of Janssen de Jong Groep, adds: “The distribution centre is divided into two mirrored buildings. Each has the same layout, with a commercial unit, a mezzanine floor, office space and a loading bay with seven loading docks. The logistics areas have a clear height of 12.20 metres. They feature super-flat floors and induction loops for forklift trucks. The entire building is also sprinkler-protected. It will be handed over with a BREEAM ‘Very Good’ certificate.”

Pouring the ground-floor slab.
Challenging schedule
The construction consortium began installing the foundations at the end of 2019. These consist of vibro piles with a concrete ground beam. The floor is supported on mini vibro piles. “We started on trust,” says Van der Meij. “The schedule was tight, so we began the preparatory work before all the details had been finalised. Some of the soil investigations had also not yet been carried out, so we did not have all the information about ground conditions. When it later emerged that a hard layer in the soil could pose challenges, we worked together to resolve them. Engineering consultancy ABT also joined the team to assess how the pile foundations were behaving in the ground. Additional soil investigations were carried out where necessary, and it was then decided whether extra piles were needed.”

An aerial view of DC Fazantweg.
Modular construction
The ground-floor slab is now complete. Bouwcombinatie Hercuton/Remco Ruimtebouw began erecting the steel frame on 11 May. The façade will be closed off with a low insulated plinth and steel sandwich panels. The building will have a steel roof. Jongkind says: “The building is due to be completed by the end of October. Certainty around the schedule is crucial for us. In that respect, the modular construction methods used by Hercuton and Remco Ruimtebouw work very well.” Van der Meij explains: “We use standard prefabricated components, delivered to the site ready for installation. All that remains is to assemble them. We can schedule and carry out this work with day-level precision.”
Quality assured
Quality is assured as well as the schedule. In preparation for the Quality Assurance (Building) Act, the construction consortium has Seconed inspect the quality of all the work. This gives Accres Real Estate confidence that the building will be of a high standard. “That is important to us, and certainly to our shareholders and tenants too,” says Jongkind. “Hercuton and Remco Ruimtebouw are handling this project professionally. That contributes to the good working relationship.” Van der Meij adds: “We have the same goal in mind. If we encounter an issue along the way, we resolve it together. The collaboration with construction manager Frans Corten, who is involved in the project on behalf of Accres Real Estate, is also running smoothly. Together, we are creating an attractive building at DC Fazantweg that can be used to its full potential.”
Question about this story? Ask your question
Who worked on DC Fazantweg
- installerVan Rennes Elektro- en InstallatietechniekMentioned in DC Fazantweg, Moerdijk | ‘Good preparation is half the job’
- construction consortiumRemco RuimtebouwIn this story
- designDENCIn this story
- engineering consultancyABTIn this story
Keep following this
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectDC Fazantweg
- SubjectDistribution centres
- CompanyRemco Ruimtebouw
- CompanyDENC
- CompanyABT