Continuity and quality take centre stage
The façade of The Blox is being prepared entirely off site. At WVH Gevelprojecten’s workshop, various specialists work on the prefabricated façade elements. Van der Heijden Geveltechniek is responsible for the expert installation of the aluminium window frames in the timber-frame elements under controlled conditions.
“Our installation team specialises entirely in fitting the window frames and glazing in the prefabricated timber-frame elements,” says Bas van der Heijden. The project involves a total of 1,271 aluminium window frames from Facédo, measuring approximately 2 metres wide and 2.60 metres high. “We also carry out the final rubber sealing straight away and prepare for the second seal, which is applied on site. There is a high degree of repetition, but that makes the work efficient and straightforward.” Two window frames are integrated into each timber-frame element before WVH Gevelprojecten completes the elements with flashings. “The process runs like clockwork, with each party joining in at a set point in the sequence.”
Finding the right balance
“We work with a consistent team of two installers in the workshop,” says Van der Heijden. “As our production depends on the number of elements available, the main challenge is keeping the schedule on track and ensuring continuity. Finding the right balance is essential. We will start another short installation run in January, followed by a longer phased period from week 15.”

Reliability and craftsmanship
According to Van der Heijden, WVH Gevelprojecten’s many years of experience are the main foundation for the project’s success. “We have been installing aluminium and PVC window frames, glass and curtain walls for more than 20 years. We also work closely with a timber-frame builder in Kapelle, and have seen prefabrication grow significantly in recent years. As a result, we are increasingly being approached for specialist projects, both prefabricated and traditional. This is already the fifth major project we have installed for Facédo. Our distinguishing qualities are reliability and craftsmanship. A man is only as good as his word. We have been delivering quality in façade construction for 20 years, and that is precisely why clients approach us.”
Have a business enquiry for Van der Heijden bouw? Get in touch
Who worked on The Blox
- complete structural shell
DESAMentioned in Another storey every eight days: building to a tight rhythm - facade elementsWVH GevelprojectenMentioned in Another storey every eight days: building to a tight rhythm
- prefabricated energy units
ERA Prefab SystemsMentioned in The Blox as a blueprint for a new way of building
Keep following this
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectThe Blox
- SubjectFaçades, roofs & roof gardens
- CompanyVan der Heijden bouw
- CompanyFacédo Geveltechniek BV