Construction projects

A large, green and sustainable residential development in Utrecht: De Cascade

Photography ©ADS Groep

A large, green and sustainable residential development in Utrecht: De Cascade

Greenery and urban architecture are increasingly going hand in hand. This is a positive development, given the many benefits it brings.

A new residential complex currently under construction in Utrecht is a fine example. Close to Terwijde station and the shopping centre in Leidsche Rijn, work is under way on De Cascade: a large, green and sustainable residential development not far from Utrecht city centre.

De Cascade involves the construction of a residential complex comprising 90 homes, including lofts, apartments, family homes and penthouses. It will also feature an underground car park for residents and a communal courtyard garden. The residential building will also have ‘exceptionally large roof terraces’.

De Cascade is being built by ADS Groep on behalf of BPD Gebiedsontwikkeling. The design is by architect Inbo, the structural engineer is Ingenieursbureau voor Bouwtechniek Goudstikker-de Vries B.V. and the building services contractor is Van Losser Installaties. Project agency Velox is also involved in the construction of the complex: at the time of publication, two site managers had already contributed more than 1,900 hours of their expertise to making the project a success.

Sustainability

The homes are designed to use as little energy as possible. Measures include:

  • Gas-free heating
  • Underfloor heating
  • Excellent insulation
  • Ventilation to ensure a healthy indoor climate

In addition, as many solar panels as possible will be installed, or the homes will be connected to sustainable energy supplied by the neighbourhood. These measures not only benefit the environment but also create a healthier living environment and, with normal use and energy-efficient appliances, a lower energy bill than that of an existing home of the same size.

The building is also characterised by a large roof garden with a variety of native plants and seating areas, as well as hundreds of metres of planting troughs on the façades, containing a wide range of plant species.

Tens of millions

The estimated cost of the project is €36.2 million, and its area is 10,800 square metres. Depending on the section of the complex, it will have between 3 and 7 storeys. Construction began in summer 2020, and the complex is expected to be completed in early 2022.

Want to contribute to projects like this? Visit velox.nl

A business enquiry for Velox? Get in touch

Who worked on it

De Cascade in Utrecht

  1. projectbureauVelox
  2. architectInbo
  3. structural engineerIngenieursbureau voor Bouwtechniek Goudstikker-de Vries B.V.
  4. installerVan Losser Installaties

Keep following this

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

What you follow
  • ProjectDe Cascade
  • SubjectConstruction projects
  • CompanyVelox
  • CompanyInbo
  • CompanyIngenieursbureau voor Bouwtechniek Goudstikker-de Vries B.V.
  • CompanyVan Losser Installaties
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.