Healthier, more comfortable and more energy-efficient homes in the Muziekbuurt in Rijswijk

Text Lieke van ZuilekomPhotography Willems Vastgoedonderhoud, Camille Lamberigts

Elk cluster krijgt zijn eigen kleur gevelstrips en stucwerk, die tevens aansluit bij de overige bebouwing in de buurt.
Elk cluster krijgt zijn eigen kleur gevelstrips en stucwerk, die tevens aansluit bij de overige bebouwing in de buurt.

In the Muziekbuurt in Rijswijk, housing association Rijswijk Wonen is improving and making 288 apartment homes more sustainable, with the aim of making them healthier, more comfortable and more energy-efficient. The housing association is working with SlimOnderhoud, a partnership between Willems Vastgoedonderhoud (building fabric and energy-efficiency maintenance) and Twinstone (resident liaison).

‘The homes are being improved in every possible way’

There are several reasons for the improvements and sustainability upgrades in the Muziekbuurt, explains Sander Willems, director of building fabric and energy-efficiency maintenance at Willems Vastgoedonderhoud. “The façades of the residential buildings were completely clad with asbestos-containing panels. As we now know that asbestos fibres can pose a serious risk to our health, Rijswijk Wonen wanted to have these panels removed. An interesting detail is that our project manager, Jan Hekhuis, also installed these panels in the 1980s, when he was still working as a carpenter.”

New façade finish on one of the blocks.

As well as removing the asbestos, the housing association has an energy-efficiency ambition: to make these post-war homes ready for the transition. “The Muziekbuurt is close to the A4, where the Zuid-Holland heat network, running from the Port of Rotterdam to the Westland, will be built in the future. The Muziekbuurt will also be connected to it. To prepare the homes, we are installing individual heat interface units, which will initially be supplied by a communal central heating boiler. We are also replacing the distribution network, to minimise heat loss. Each residential block will have its own central heating boiler, with water pressure increased by a booster pump.”

Minimal heat demand, maximum comfort

For the energy transition to succeed, it is important to substantially reduce the heat demand in the homes, Willems emphasises. “To achieve this, we have drawn up a plan to upgrade and insulate the entire building envelope, including the roof. Our technical inspection showed that the window frames were still in excellent condition, so, in the interests of sustainability and circularity, they will only be upgraded.” Hekhuis adds: “All the frames will be fitted with new glazing and opening elements, bringing them into line with current requirements. These measures, along with others, will significantly reduce residents’ energy consumption. They will also be able to enjoy optimum living comfort, without complaints about cold or draughts.”

“The energy ambitions for this project are high,” says Willems. “PV panels will be installed on all the roofs. A thick layer of insulation will also be applied to the roofs and façades, together with a new façade finish. Our in-house architect has designed this, giving each cluster of blocks a distinctive appearance. To pay tribute to the Muziekbuurt, musical clefs will be incorporated into the design of the brick slips on the gable ends. Each cluster will also have its own colour of façade strips and render, chosen to complement the other buildings in the neighbourhood. This will really give the area a lift.” Hekhuis adds: “The loggia frames will be replaced with aluminium frames, which require considerably less maintenance. The concrete balcony thresholds, carefully incorporated into the insulation, will also contribute to this. The front gardens, where conifer hedges, fences and concrete slabs had grown into a jumble, will be cleared and planted with uniform beech hedges no higher than 1.20 metres.”

The entire building envelope is being upgraded as part of the improvements and sustainability works.

UAV-GC contract

Willems Vastgoedonderhoud is carrying out the work in the Muziekbuurt under a UAV-GC contract, explains Willems. “This means we also prepared the technical plans for the works, covering both external and internal work, and clearly identified any potential disruption to residents and neighbours. In part due to the coronavirus pandemic, it was decided that only work to the building envelope would be carried out while the homes were occupied. During the work inside their homes, residents will stay in temporary accommodation for three weeks. Twinstone will coordinate and oversee all of this.”

Convenience, comfort and safety

Kitchens, bathrooms and toilets are being replaced in the homes, says Hekhuis. “The ventilation systems are also being upgraded. As hot tap water will now be supplied by the communal system, electric and gas water heaters are being removed, freeing up a considerable amount of space. We are carefully checking all the homes for dead legs in the pipework, which will improve Legionella safety. The entrance doors to the communal areas are also being replaced so they meet current fire safety requirements. A new video intercom system will give residents greater convenience, comfort and safety. The homes are being improved in every possible way.”

Three construction sites

To ensure that the work can be carried out properly and on schedule, three construction sites, each the size of a football pitch, have been set up between the building clusters. “This is unprecedented in the Rotterdam-The Hague metropolitan area,” says Hekhuis. “These sites allow us to store a lot of materials on location, so the contractors almost never run short. They also prevent any impact on public spaces.” The final work is due to be completed in March 2023.  

A business enquiry for IJsselmonde? Get in touch

Who worked on it

  1. ClientRijswijk Wonen
  2. Contractor Willems Vastgoedonderhoud (bouwkundig en energetisch onderhoud)
  3. Resident liaisonTwinstone
  4. External envelope insulationIJsselmonde BV
  5. Basement and cavity wall insulationTechnisol Draaiende delen (houten ramen en deuren)
  6. Opening elements (timber windows and doors)Verweij Houttechniek
  7. Building roofsKonrad Roof Technology
  8. Balcony railingsN. Knoll B.V.
  9. Construction hoistsMol Lifting
  10. Façade scaffoldingPost Steigers
  11. GlazingAlhra Glas

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction projects
  • CompanyIJsselmonde
  • CompanyAlhra Glas B.V.
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.