Car park, Emmen | Third time lucky: generous underground parking in Emmen

The high-rise development planned above the existing Willinkplein car park cannot get under way until its extension is complete. BudoBouw BV, based in Zwolle, is currently working hard to deliver this underground extension, which will provide around 365 parking spaces on level -1, as well as various plant rooms, a sprinkler tank, a new stairwell and a lift on level -2, on the south side of Raadhuisplein in Emmen. The project is being delivered by Akor BV of Rijssen for developer Peter van Dijk.

The underground car park during the concrete pour.
We meet BudoBouw’s operations manager, Jeroen van Ostaijen, at the company’s offices in Zwolle. “One interesting detail about this project is that we also built the car park that is now being extended,” he says. “This extension lengthens the previously completed car park, which is entirely underground.”

The starter bars have now been covered.
Structural work reaches its final phase
At the time of this interview, BudoBouw is in the final phase of the structural work. “The stairwell and lift enclosure, as well as the sprinkler tank, are also within our remit,” Van Ostaijen explains. “After the summer construction break, we will start work on the ramps from level -2 to -1 and the external ramp, which will serve as the new entrance to the car park. This extension is on level -1 and will provide access to level -2. To connect it to the existing section, a partition wall first had to be demolished.”

Construction materials in storage.
Monolithic floor with concrete beam foundations
“Level -2 had to be completed by Christmas, and we managed it. From Christmas until now, we have completed all the foundations and floors for level -1. This involves a monolithic floor with concrete beam foundations. We are using our standard methods, but devised a special sequence for pouring the foundations and floor so that the beams and columns could be installed sooner. After the summer construction break, once the prefabricated superstructure is ready, we will build the internal ramps and the new entrance ramp to provide access to the entire car park, as well as the topping slabs over the basement roof,” Van Ostaijen explains. The precast hollow walls and columns were built by a third party. “BudoBouw will fill these hollow walls with concrete, and the same applies to the topping slabs at ground level.”

The sprinkler tank on level -2.
BudoBouw is adding a total of 5,000 m2 of parking space beneath the prestigious high-rise development that is yet to be built. “That will provide around 365 additional parking spaces, on top of those already available in the previously built car parks,” Van Ostaijen concludes.
A business enquiry for BudoBouw? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects
- CompanyBudoBouw