Wine silos on the roof of The Harbour Club
Text Desiree PenningsPhotography M.C. Kersten B.V.

The wine silos on the roof of The Harbour Club are the building’s main attraction. A special steel lifting frame was needed to hoist the silos into position.
This lifting frame, along with the main supporting structure for the rest of the project, was supplied by M.C. Kersten B.V..
Kersten supplied and installed the floors, spiral staircases, window frames and extensions for all three silos. To ensure they retained their shape, the company fabricated a special steel structure, which was installed inside the silos on the ground. Sander Kersten explains: “When the silos were hoisted onto the roof, we installed them with the complete structure inside. It weighs 38,000 kilos, so you can’t just put it on a roof. Special transport and 750-tonne cranes were needed to move them into position and hoist them up.” The biggest challenge was getting the components inside the silos and securing them there, as everything had to pass through a manhole. The hoisting had to be done using manual chain hoists and winches.
In addition to the silos, Kersten also made the trussed frame for the new build and the steel structure for the box-in-box construction. Kersten says: “We’ve been working with building contractor De Nijs for over fifty years, and LEVS architecten is no stranger to us either. So we know what to expect from each other.”
Question about this story? Ask your question
Who worked on it
The Harbour Club
- main load-bearing structureM.C. Kersten B.V.
- construction companyconstruction company De Nijs
- architectLEVS architecten
Keep following this
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectThe Harbour Club
- SubjectConstruction projects
- CompanyM.C. Kersten B.V.
- Companyconstruction company De Nijs
- CompanyLEVS architecten