Wilko Fruit Business Premises | Breda

Wilko Fruit is building new business premises. The dynamic importer of soft fruit such as strawberries, blackberries and tomatoes has been growing year on year. Its new site in Breda will provide room for further growth for the foreseeable future, while enabling the company to improve its processes and work more sustainably.
Hybrid construction for fast, high-quality building
9,500 m² of precast concrete installed in five weeks
Wilko Fruit’s new business premises are located on the Heilaar-Noord business park in Breda. Wilko Fruit bought two plots here for the construction of a warehouse with offices, covering a total area of around 9,500 m². The ground floor measures approximately 8,500 m², while the office floor and mezzanine together cover more than 1,000 m². The plots also provide space for parking and access roads. The building and the landscaping of the surrounding site were completed by Willy Naessens Industriebouw.

Ground improvement
Before construction began, Willy Naessens first improved the quality of the ground beneath the future building. The company increased its bearing capacity and used shallow foundations. The structure was then erected using a concrete frame. “The design, engineering and production were all carried out in-house,” says Herman Wijgerse, site manager at Willy Naessens. “25 lorries a day transported the concrete elements from our parent company in Belgium to Breda. Two teams assembled the elements on site.”

Hybrid construction
The entire structure consists of concrete and steel. The walls are made up of smooth concrete walls, silex concrete and sandwich panels; the roof consists of hollow-core slabs and TT roof elements. Wijgerse says: “The combination of concrete roof beams and TT elements makes it possible to create a high-quality roof structure quickly, suitable for large spans. The elements are easy to handle and self-supporting.”
Facades and floors
The window frames, curtain walling and canopy are finished all around with 4 mm-thick aluminium composite cladding. This gives the building’s plinth an attractive appearance. Above it, the facades are made of grey sandwich panels. The mezzanine and office floors are made of hollow-core slabs with a concrete topping. Underfloor heating was installed where needed, both to provide heat and to prevent condensation between the individual cold rooms.

At speed
“The entire concrete structure, with a ground-floor area of 9,500 m², was assembled in five weeks,” says Wijgerse. “That means the work progressed incredibly quickly. We are currently at the finishing stage. That is necessary, too, as Wilko Fruit’s peak season starts in May. For us at Willy Naessens, this mainly means managing and coordinating effectively. We work with regular subcontractors and specialist contractors, such as the services installers and the supplier of the five large cold rooms. They work entirely independently and to schedule. My role is to ensure that everyone sticks to the agreements made. If all goes to plan, we will hand over the project at the beginning of May, including the infrastructure, paving around the building and the bicycle shelter.”
Een zakelijke vraag aan Willy Naessens Nederland? Get in touch
Who worked on it
Wilko Fruit Breda business premises in Breda
- is building new commercial premisesWilko Fruit
Keep following this
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectWilko Fruit Breda business premises
- SubjectConstruction projects
- CompanyWilko Fruit
- CompanyWilly Naessens Nederland