Construction projects

ING Headquarters, Amsterdam | Putting users first, stitching the city together

ING Headquarters, Amsterdam | Putting users first, stitching the city together

‘Connecting on every level’

Known as ‘Cedar’, ING’s new headquarters in Amsterdam-Zuidoost opened in January. The bank’s new main office comprises a transparent complex with horizontal articulation, connecting previously segregated traffic flows through a public garden with a café pavilion. “The space around the building will be opened to the public and become part of the urban realm under the name Cumulus Park,” says Pascal Cornips of Benthem Crouwel Architects.

ING has its own office concept, but with its new headquarters it wanted above all to highlight the company’s dynamic nature: a move from an imposing bank to a dynamic business with close ties to its customers. Cornips says: “The building’s position in the urban context, together with its open, inviting architecture, creates new connections and gives a huge boost to the public realm.” The 11,000 m² car park is half-submerged, bridging the level difference familiar in Zuidoost between cycle and pedestrian routes at ground level and the elevated roads for cars. This makes ‘Cedar’ part of the city’s urban vitality. “Previously, the separation of traffic flows led to a lack of social safety. Now, the car park’s accessible roof, a landscaped embankment and a transparent building open on all sides stitch the public realm together, creating a ‘public garden’ where pedestrians also feel at ease. The new headquarters seeks to connect with the city and its residents.”

Hoofdkantoor ING   Amsterdam

Large expanses of glazing are among the building’s BREEAM features.

Connecting with the outside world

The design team, comprising Benthem Crouwel Architects, landscape architects Karres en Brands and interior architects HofmanDujardin, made a clear effort to connect with the outside world. They designed a building with two wings, linked by a bridge section at the Abcouderpad. Both wings feature full-height atria with restaurants and an auditorium. “Platforms bridge the atria on every floor, creating a vertical landscape that offers both freedom and connection. The workspaces are designed for team-based agile working, with inviting meeting places and an intuitive, functional interior layout, free of dead ends.” The building is as flexible as possible, with open floor plates and long spans. The floors are topped with aluminium canopies that project several metres, providing effective solar shading as well as a calm façade and horizontal articulation. The building was designed to achieve BREEAM ‘Outstanding’, with features including a healthy working environment and strong connections to the public realm. The public garden, Cumulus Park, will be landscaped with greenery and trees rooted in the roof of the car park. Like the façade corners and the interior, the transitions between public areas are organically rounded, creating a calm, open character. “The green space has a natural ability to connect.”

‘Connectivity’

The building, completed by G&S Bouw in 2019, was officially opened in mid-January. 2,800 ING employees are moving to the new ING ‘Cedar’ on Frankemaheerd, a few hundred metres to the north, including from the nearby former headquarters nicknamed ‘Zandkasteel’. “Although the park still needs to be fully completed, the impact of the ideas behind it is already clear,” says Cornips. “It’s great to see. The site is becoming part of the city, a meaningful urban location. Employees who had not seen one another for years in the old setting are now meeting. Together with our design partners, we have also succeeded in creating a sense of freedom that fits the dynamic culture associated with major tech companies. ‘Connectivity’, between employees, between ING and other companies, and between ING and the surrounding neighbourhood, was our starting point. We have achieved that goal, and we are proud of it, especially given the scale of the design.”   

Question about this story? Ask your question

Who worked on it

Cedar in Amsterdam

  1. architectBenthem Crouwel Architects
  2. landscape architectKarres en Brands
  3. interior architectHofmanDujardin

Keep following this

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

What you follow
  • ProjectCedar
  • SubjectConstruction projects
  • CompanyBenthem Crouwel Architects
  • CompanyKarres en Brands
  • CompanyHofmanDujardin
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.