The shell of the most sustainable Van der Valk hotel is complete

Anyone who regularly drives along the A1 will have seen the building emerge from the ground in recent months: Dura Vermeer Bouw Hengelo is building the new, sustainable Van der Valk hotel in Deventer.
A new floor every ten days
The Van der Valk hotel has ten floors, with 140 hotel rooms, a restaurant, seven meeting rooms and two conference halls. The ninth and tenth floors will house a fitness centre and wellness centre with a swimming pool. As developer and contractor, Dura Vermeer Bouw Hengelo is delivering the hotel's structural frame, façades and first-fix interior work.
Balconies clad in brick slips
Dura Vermeer demonstrated smart working on the balconies, which had to be clad in brick slips. “The best results on this kind of work are achieved in controlled conditions,” says Huub Scholten, site manager at Dura Vermeer. “So we set up a kind of balcony factory on site, within reach of the tower crane. We clad the balconies with brick slips on flatbed trailers inside a heated tent. They were then ready to be lifted straight to their positions. This also allowed us to keep working in bad weather.”

The tower crane required meticulous logistical planning.
Challenging logistics
To ensure that all the structural work fitted together seamlessly, all the parties worked closely together. They jointly planned the tower crane's logistics. “We worked through various scenarios,” says Scholten. “Would it be better to erect two or three concrete walls a day? And would it be better to cast the floor in two or three shifts? This approach saved us a lot of time. The daily start-of-shift talks on safety, quality, respect and planning also helped us get all the details right.”
Ensuring safety
As one crew worked its way up the building with the structural frame, completing a floor every ten days, another crew began closing in the façades on the second floor so that interior work could start there. The scaffolding was then lowered from the top, floor by floor, to install the external soffits and glass balustrades. Scholten says: “You can imagine the logistical planning needed to ensure everyone's safety.”
Eye-catcher
The lobby features a curved, circular in-situ concrete staircase. “We entrusted this specialist craftwork to someone with experience in this kind of concrete work, including at other Van der Valk hotels. It was an intensive job in terms of setting out and reinforcement work, but the result speaks for itself.”
To meet sustainability goals, sustainable building services were chosen throughout, including a high-temperature heat pump, a thermal energy storage system (WKO) and the KAT system developed by Linthorst Techniek, which cleans and reuses warm air from the kitchen. The roof was covered with solar panels. Dura Vermeer also fitted the façades with triple glazing and used exceptionally high insulation values for the cavity walls and roof.
Vraag over dit verhaal? Ask your question
Wie eraan werkte
Hotel Van der Valk Deventer in Deventer
- Ontwikkelend bouwerDura Vermeer Bouw Hengelo
Blijf dit volgen
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectHotel Van der Valk Deventer
- SubjectConstruction projects
- CompanyDura Vermeer Bouw Hengelo
- CompanyLinthorst Techniek