Residential and non-residential construction

Rhapsody Amsterdam | ‘Logistical puzzle’ to optimise façade performance

Rhapsody Amsterdam | ‘Logistical puzzle’ to optimise façade performance

White aluminium façade mullions and panels create vertical articulation in the façade of Rhapsody in West. The many curves and shapes, together with the demand for a slim, airtight façade system, led to façade manufacturer VPT Versteeg, which produced and installed the required system in-house. “We are moving increasingly towards a digital construction site, where all components are designed before construction begins,” says director Peter Moser.

In this particular case, that was no luxury, he says. “In terms of production and volume, Rhapsody in West is perfectly manageable for us. Most of it consists of flat façade panels that are relatively easy to mill and fitted with a standard mounting rail. The logistical puzzle of installation was the main challenge, and the requirements for noise levels and insulation were high, with airtightness tests carried out afterwards.”

VPT Versteeg supplied all the white aluminium mullions and panels between the brickwork and decorative precast concrete bands. “Every aspect of the delivery was discussed in detail with the client and the architect, with whom we have already completed several bespoke projects. This included the choice of coating: a white façade panel close to a motorway calls for a high-quality finish. Standard insulation cladding could not provide the slim façade build-up required, so we held extensive discussions with the supplier during the engineering phase.”

Taking an integrated approach to specification and pricing makes it possible to coordinate issues of this kind. The same applies to the 3D/BIM working method. “We are investing heavily in the digital construction site and find that the BIM working environment is increasingly being approached in an integrated way. It is essential to do your preparatory work properly, so that you know exactly what will happen on site. This project combined airtightness with a slim façade build-up, which was a challenging assignment. When the interfaces between different components are prepared perfectly, the logistics can also be planned effectively, even for bespoke deliveries with a wide variety of shapes.”

Question about this story? Ask your question

Who worked on Rhapsody in West

  1. turnkey contractorHiensch EngineeringMentioned in Rhapsody, Amsterdam | Integrated building services concept with a negative EPC
  2. manufacturerSIG Air HandlingMentioned in Rhapsody, Amsterdam | Integrated building services concept with a negative EPC
  3. development consortiumSBB: De NijsMentioned in Rhapsody, Amsterdam | Rhapsody in West:
  4. investorCBREMentioned in Rhapsody, Amsterdam | Rhapsody in West:
  5. community participationUrban SYNCMentioned in Rhapsody, Amsterdam | Rhapsody in West:
  6. façade manufacturerVPT VersteegIn this story
  7. structural engineerVan Rossum Raadgevende IngenieursMentioned in Building with prefabricated elements to shorten construction time
  8. clientB-Right Urban LivingMentioned in Building with prefabricated elements to shorten construction time
  9. clientDoniger Urban DevelopmentsMentioned in Building with prefabricated elements to shorten construction time
  10. architectDe Loods Architecten en AdviseursMentioned in Building with prefabricated elements to shorten construction time
  11. main contractorDura Vermeer Bouw Midden West BVMentioned in Building with prefabricated elements to shorten construction time
  12. prefabricated frameByldisMentioned in Building with prefabricated elements to shorten construction time
  13. installerSchouten TechniekMentioned in Building with prefabricated elements to shorten construction time
  14. façade constructionScheldebouwMentioned in Building with prefabricated elements to shorten construction time

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectRhapsody in West
  • SubjectResidential and non-residential construction
  • CompanyVPT Versteeg
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.