Construction projects

From energy label F to A!

Text Faay VianenPhotography Faay Vianen

From energy label F to A!

The insulation requirements for buildings are high. Good insulation, a high level of airtightness and minimising thermal bridging are the most important steps. The 353 homes in the Lombok district of Utrecht are getting a major makeover. All the homes are being upgraded from energy label F to an average of energy label A. Faay Vianen supplied the ceilings and W’all-in-One® PG60 internal insulation systems.

Vapour control membrane prevents errors

W’all-in-One® provides a high level of thermal insulation with minimal thickness, while maintaining its thermal performance over time. The system consists of PIR bonded to a 9.5 mm-thick plasterboard. The PIR board has a vapour control membrane on both sides. This is useful because mistakes are still often made when installing these membranes on site. This ‘all-in-one system’ is easy to install and certainly helps to reduce
the cost of errors.

60 minutes of fire resistance

Choosing the Faay GP22 VO ceiling system was also an obvious decision. The ceiling provides 55 dB of sound insulation. Installing a suspended ceiling also has the advantage of improving the fire resistance of the floor structure, as well as sound insulation. In this district, the homes above still have timber intermediate floors. The ceiling’s fire protection must provide at least 60 minutes’ resistance to fire penetration and spread. The ceiling therefore ensures a safe escape route for residents of the home above.

Supplied to length

The large volume of work means that Faay can manufacture the panels to size for this project. Suppliers have also produced and supplied the raw materials to size. The result is a considerable saving on purchase costs, labour time, material costs and cutting waste. This eliminates material waste throughout the supply chain, contributing to greater sustainability.

Comfortable living

The prefabricated all-in-one system, combined with fast installation, minimises disruption to residents. Once the renovation is complete, the homes will once again fully meet today’s requirements. This is important for current and future residents. The homes are being upgraded from energy label F to an average of label A, making them more sustainable, healthier and safer. In future, residents will also benefit from significant savings on their energy bills and enjoy a warmer home!

Dankzij deze renovatie voldoen de huizen straks weer helemaal aan de eisen van deze tijd.

Once the renovation is complete, the homes will once again fully meet today’s requirements.

Rental homes under resident management

During the preparatory phase, a test home was completed to trial the proposed approach and give residents an impression of the planned renovation work. After the extensive maintenance work, Bo-Ex will transfer the homes to the residents to manage themselves. Residents will maintain and manage their own residential complex, which comprises several blocks and streets.

Project information

Main contractor works with co-maker on the building envelope

For various works to the building envelope of homes in the Lombok district, contractor Plegt-Vos brought in a co-maker. As it has done on many occasions, it chose GB&O of Houten, which draws on many years of experience and expertise in maintaining and renovating complete building envelopes: brickwork and pointing, roofing, window-frame maintenance and renovation, painting and energy-efficiency improvements.

“For us, a good start is half the job. That’s why we first listen to our clients and work with them to achieve a good result,” says director Marcel Vink. “As co-maker for Plegt-Vos, we are renovating around 350 homes in the Lombok district. We are replacing window frames, repairing the brickwork and cracks, and replacing the façade ties. We are also installing internal insulation systems and fire-resistant ceilings, including the associated finishing work. For this, we are using Faay’s W’all-in-One® PG60 system and GP22 VO ceiling system respectively. We reviewed both solutions in detail with our client Plegt-Vos and supplier Faay before the work began.”

GB&O has already upgraded more than 40 homes in the district. The project is divided into 78 phases, which follow on seamlessly from one another and will take just over 2 years to complete, finishing in mid-2022.

A business enquiry for Faay Vianen B.V.? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction projects
  • CompanyFaay Vianen B.V.
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.