Van Berlo | A look back at 2018

We look back on 2018 with great satisfaction. This article reviews the past year and the diverse range of projects to which we have been able to contribute.

DC Lidl: Oosterhout
Commissioned by Bouwbedrijf Van de Ven
96,089 m² of concrete flooring poured.

DC Hoogvliet: Bleiswijk
Commissioned by ASK Romein
85,880 m² of concrete flooring poured,
12,359 Mini Vibropalen installed and the foundation structure provided.

Sugar Fields: Etten-Leur
Commissioned by Heylen Warehouses
77,500 m² of concrete flooring poured and
20,390 Mini Vibropalen installed.

Nike: Laakdal (B)
Commissioned by Stadsbader
54,613 m² of concrete flooring poured.

DC Dudok: Maasvlakte
Commissioned by De Vries en Verburg
52,686 m² of concrete flooring poured.

DC Jumbo: Nieuwegein
Commissioned by Bouwbedrijf Van de Ven
49,289 m² of concrete flooring poured, 10,126 Mini Vibropalen installed
and the retaining walls and prestressed hollow-core slabs provided.

DC Ingram Micro: Tilburg
Commissioned by Heerkens & Van Bavel
46,480 m² of concrete flooring poured,
the loading bay and impact protection provided.

DHL: Zaltbommel
Commissioned by Hercuton
39,500 m² of concrete flooring poured,
10,025 Mini Vibropalen installed and the dock structures provided.

DHL: Wijchen
Commissioned by Wijnen Bouw
34,917 m² of concrete flooring poured, 6,295 Mini Vibropalen installed
and the loading bay, foundation and dock structures provided.

DC Mainfreight: Zaltbommel
Commissioned by Wouters Schijndel
32,823 m² of concrete flooring poured and
8,407 Mini Vibropalen installed.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects


















