Residential and non-residential construction

‘Sluishuis gets an energy-efficient and cost-effective climate control concept’

Text Lieke van ZuilekomImage Beeldenfabriek (3D visualisations)

The courtyard.
The courtyard.

The Municipality of Amsterdam has clear and ambitious goals when it comes to sustainability and energy efficiency.

“Klimaatgarant regularly helps deliver on these goals, working with partners such as VORM and BESIX,” says Gert Jan ’t Hart. “Following projects including Zeeburgereiland, STATE and BOLD (Overhoeks), we were approached to work on Sluishuis, where a host of initiatives and technologies are being implemented to guarantee an energy performance coefficient (EPC) of -0.01. As tender partner to the VORM and BESIX RED development consortium, we helped devise the most energy-efficient and cost-effective climate control concept for the new build. We are also responsible for the engineering, supply and installation of the ground energy system and the associated Itho Daalderop heat pumps.”

On the landward side, the buildings rise in a series of stepped terraces.

“Klimaatgarant was founded in 2012 to help municipalities and property developers deliver energy-neutral homes, residential buildings and neighbourhoods cost-effectively,” says ’t Hart. “Our approach is based on the Trias Energetica, a three-step strategy for managing energy consumption efficiently. We expect every party involved to do its best. To minimise the energy demand of a home, residential building or neighbourhood, building measures such as good insulation, balanced ventilation with heat recovery (MVHR), triple glazing and a shower heat recovery system are essential. The remaining energy demand can be met perfectly by a heat pump using ground energy, combined with, for example, solar panels.”

Open-loop system

Sluishuis meets these ‘prerequisites’ perfectly, ‘t Hart emphasises. “This project is ideally suited to a ground-source heat pump. Unlike most projects, where we use closed-loop ground collectors, Sluishuis has an open-loop system. That is hardly surprising, as the project occupies a unique position on the water.” The ground energy system provides energy-efficient heating in winter and cooling in summer. “Cooling is particularly important these days. Now that we insulate our homes so well, there is a risk of overheating during the hot summer months. We actively monitor all the systems we install. The data we collect shows, for example, that an average apartment requires heating for just 800 hours a year, with water from the ground source raised from around 15°C to 30°C. The number of hours of passive cooling has risen to as many as 2,500 per year. This means that water at 15°C flows through the pipes for around 30% of the time. As a result, minimal energy consumption and optimum living comfort go hand in hand. As an organisation, we are taking numerous initiatives to raise awareness of this across the market.”

Gert Jan ’t Hart of Klimaatgarant. (Image: Marcel Krijger)

Climate for life

The project has opted for Itho Daalderop heat pumps. Like Klimaatgarant, the company is part of the Climate for life (CFL) holding company. The required capacities, ranging from 2.5 to 7.5 kW, were determined according to the size of each home and its hot water demand. Solar panels by Klimaatgarant Solar are also being installed in the project. “Our operating company NEXT NRG is responsible for running the systems,” says ’t Hart. “Homeowners have two options: they can buy or lease their heat pump. In both cases, the systems are maintained, cleaned, repaired and replaced at a fixed rate. NEXT NRG is also responsible for the long-term operation of the open-loop system, which will belong to the owners’ association.”  

Have a business enquiry for Klimaatgarant? Get in touch

Who worked on Sluishuis

  1. structural engineerVan Rossum Raadgevende IngenieursMentioned in Sluishuis: Landmark gateway to IJburg
  2. Formwork and support systemsDokaMentioned in Sluishuis: Landmark gateway to IJburg
  3. timber frame elementsVIANENMentioned in Sluishuis: Landmark gateway to IJburg
  4. Aluminium profile systemsKawneerMentioned in Sluishuis: Landmark gateway to IJburg
  5. Building servicesKlimaatgarantMentioned in Sluishuis: Landmark gateway to IJburg
  6. Setting out and monitoringFundMentioned in Sluishuis: Landmark gateway to IJburg
  7. ClientGemeente AmsterdamMentioned in Sluishuis: Landmark gateway to IJburg
  8. DevelopmentDevelopment consortium VORM Ontwikkeling/BESIX Real Estate Development (RED)Mentioned in Sluishuis: Landmark gateway to IJburg
  9. architectBjarke Ingels Groep (BIG)Mentioned in Sluishuis: Landmark gateway to IJburg
  10. architectBARCODE ArchitectsMentioned in Sluishuis: Landmark gateway to IJburg
  11. Construction managementBOAGMentioned in Sluishuis: Landmark gateway to IJburg
  12. Quality checksBBC BouwmanagementMentioned in Sluishuis: Landmark gateway to IJburg
  13. ConstructionVORM Bouw/BESIX Nederland construction consortiumMentioned in Sluishuis: Landmark gateway to IJburg
  14. Foundations, earthworks and dewateringHeSto v.o.f.Mentioned in Sluishuis: Landmark gateway to IJburg
  15. Reinforcing steelBalvert BetonstaalMentioned in Sluishuis: Landmark gateway to IJburg
  16. Timber and sheet materialsHoutgroep Van DrimmelenMentioned in Sluishuis: Landmark gateway to IJburg
  17. All-glass balustradesFEK MetaalMentioned in Sluishuis: Landmark gateway to IJburg
  18. Building servicesETB Cas SombroekMentioned in Sluishuis: Landmark gateway to IJburg
  19. Building servicesVan der Sluis Technische BedrijvenMentioned in Sluishuis: Landmark gateway to IJburg
  20. development consortiumVORM/BESIX REDMentioned in ‘Sluishuis will be perfectly level when completed’
  21. architectBIG ArchitectsMentioned in ‘Sluishuis will be perfectly level when completed’
  22. dewateringMos GrondwatertechniekMentioned in ‘Building on water is a job for specialists’
  23. clientVORMMentioned in ‘Building on water is a job for specialists’
  24. clientBESIXMentioned in ‘Building on water is a job for specialists’
  25. sheet piling and foundation pilesGebr. van 't Hek B.V.Mentioned in ‘Building on water is a job for specialists’
  26. groundworks and dewateringRoel van der Stoel B.V.Mentioned in ‘Building on water is a job for specialists’
  27. engineering consultancyIngenieursbureau HektecMentioned in ‘Building on water is a job for specialists’
  28. dredgingDe Vries & van de Wiel B.V. (DEME Group)Mentioned in ‘Building on water is a job for specialists’
  29. façade contractorFacédoMentioned in Raw aluminium gives Sluishuis a distinctive, natural appearance
  30. tender teamVORM Bouw/BESIXMentioned in Raw aluminium gives Sluishuis a distinctive, natural appearance
  31. development consortiumBESIX REDMentioned in ‘Integrating electrical services is a major challenge’
  32. the complete electrical installationElektrotechnisch Bureau (ETB) Cas SombroekMentioned in ‘Integrating electrical services is a major challenge’
  33. sanitary and ventilation systemsVan der Sluis Woningbouw BVMentioned in Sluishuis: beautiful but challenging
  34. senior site managerBESIX NederlandMentioned in A comprehensive solution for Sluishuis, a striking landmark
  35. architectBIGMentioned in A comprehensive solution for Sluishuis, a striking landmark
  36. heat pumpsItho DaalderopIn this story
  37. operating companyNEXT NRGIn this story
  38. solar panelsKlimaatgarant SolarIn this story
  39. development consortiumVORM OntwikkelingMentioned in Sluishuis reaches its full height. Millimetres between theory and practice
  40. construction consortiumVORM BouwMentioned in Sluishuis reaches its full height. Millimetres between theory and practice
  41. aluminium façade claddingSorbaMentioned in Sluishuis sustainability ambitions extend to its timber façade elements
  42. timber subframesVan den HondelMentioned in Sluishuis sustainability ambitions extend to its timber façade elements
  43. facade scaffolding and floor supportsMatemco HulpconstructiesMentioned in 1,100 tonnes of temporary works for Sluishuis Amsterdam
  44. installationSteigerbouw MontyMentioned in 1,100 tonnes of temporary works for Sluishuis Amsterdam
  45. anchoring systemSchöck Nederland bvMentioned in Cantilevered balconies with thermal breaks
  46. balcony elements and concrete floorsHCI PrefabMentioned in Cantilevered balconies with thermal breaks
  47. timber and sheet materialsVan DrimmelenMentioned in ‘Logistics arrangements are key to an efficient construction process’

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectSluishuis
  • SubjectResidential and non-residential construction
  • CompanyItho Daalderop
  • CompanyNEXT NRG
  • CompanyKlimaatgarant Solar
Share this article

Advertisement

Follow on Stedenbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.